Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

San Souci Road Elevation Design
Infrastructure
Design
WA

Tabor-Crowall - Brodell Constructability Review
Term Contract
Design
$100,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Gridline Apartments
New Construction, Infrastructure
Construction
$66,400,000 CJ est. value
Seattle, WA 98122

Gridline Apartments
New Construction, Infrastructure
Construction
$66,400,000 CJ est. value
Seattle, WA 98122

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Tabor Crowall Brodell CM&I
Term Contract
Design
$250,000 est. value
WA

Reported 08/13/2022 12:00 AM
Project Title

RFQ Engineering - 2022 SR 99/148th St SW VIC to Evergreen Way - Corridor Improvement

Physical Address View project details and contacts
City, State (County) Seattle, WA 98101   (King County)
Category(s) Heavy and Highway, Professional Services, Sewer and Water
Sub-Category(s) Inspection Services, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Accepting Qualifications, Construction Start Expected August 2023,
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

County: Statewide The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services related to the design, development, and delivery of SR 99/148th St SW VIC to Evergreen Way - Corridor Improvements. The main driver for this project is a business access and transit (BAT) lane for Community Transit's Swift Blue line. The project includes one (1) fish barrier, widening and reconstruction of existing shoulders, providing concrete pads for planned transit stops, placing raised islands to improve operations and safety, adding curbed sidewalks/ADA improvements, paving, striping work, retaining walls/bridge structure, stormwater conveyance systems, stormwater treatment facilities, ITS, signal, and illumination. The agreement will be approximately four (4) years in duration and will total a combined agreement amount of approximately $1.0 to $2.5 million with the option for WSDOT to supplement for additional time and money if necessary. The method of contractor selection has not been determined at this time. WADOT - 2022 SR 99/148th St SW VIC to Evergreen Way - Corridor Improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents