Similar Projects
Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

San Diego State University IV Dorms
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calexico, CA 92231

Winterhaven Shade Structure
Infrastructure
Bidding
$200,000 CJ est. value
Winterhaven, CA 92283

Water Treatment Plant Chlorine Conversion Project
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
El Centro, CA 92243

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Drilling Services
Term Contract
Post-Bid
Calexico, CA

Heber Avenue Improvements
Infrastructure
Results
$953,375 est. value
Heber, CA 92249

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Rockwood Avenue Fourplex
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Calexico, CA 92231

Cole Boulevard Apartments
New Construction, Infrastructure - 52,124 SF
Pending Verification
$14,000,000 CJ est. value
Calexico, CA 92231

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Parks Division Yard Improvements Project
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
El Centro, CA 92243

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Install Rumble Strips, Upgrade Guardrail, and Upgrade Facilities to Americans With Disabilities Act (ADA) Standards
Infrastructure
Design
$10,456,000 CJ est. value
Rockwood, CA 92227

Last Updated 03/10/2023 10:06 AM
Project Title

Dogwood Road Improvements at Wake Avenue and Danenberg Drive

Physical Address View project details and contacts
City, State (County) Brawley, CA 92227   (Imperial County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,241,857 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services The work shall include grinding of existing asphalt concrete pavement, complete removal of existing asphalt concrete pavement and all underlying material, removal of existing concrete curb & gutter/sidewalks/ADA ramps and all underlying material, unclassified excavation, installation of conventional-asphalt concrete, traffic signage & striping, utility adjustments, storm drain infrastructure, aggregate base, curb & gutter, sidewalks, raised median, guardrail, railing, traffic signal modifications, and traffic control as described in Chapter 5 of the Caltrans Traffic Manual and the latest edition of Manual of Uniform Traffic Control Devices ("California MUTCD"). Other Details The scope of work is more specifically described on the construction plans and in these Specifications. Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements California contractors license Class A Online Q&A Yes Q&A Deadline 09/19/2022 11:59 PM (PDT) Bid Valid 120 calendar days Liquidated Damages $1,000 per Day Project Duration 180 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 09/19/2022 11:59 PM (PDT)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents