Similar Projects
2022 Local Paving Projects - Contract C - Roadway Reconstruction
Infrastructure
Bidding
$200,000 est. value
Waterville, ME

Paving
Infrastructure
Bidding
$3,841,000 est. value
Benton, ME

Brunswick Avenue Hot Mix Asphalt Paving
Infrastructure
Post-Bid
Gardiner, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Gravel Road Construction
Results

Outlet Road Paving and Culvert Replacement
Results
Farmingdale, ME 04344

On Call Maintenance Paving
Infrastructure
Post-Bid

2021 Paving
Results
Readfield, ME

Contract 1 - 2022 Local Paving Projects Shim and Overlay and Reclaim Roadway Projects
Infrastructure
Post-Bid
Waterville, ME

2021 Local Paving Project - Eight Rod Road and Marston Road
Results
Waterville, ME 04901

Add Shoulder Aggregate to Existing Shoulders
Infrastructure
Post-Bid

Brunswick Avenue (Route 201) Retaining Wall Rebuild and Mill and Fill Paving Project
Results
Gardiner, ME 04345

Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements
Infrastructure
Post-Bid
$1,069,000 est. value
Augusta, ME

Pavement Milling and Ultra - Thin Bonded Wearing Course
Results
Less than $977,000 est. value
Vassalboro, ME

Pittston Paving
Infrastructure
Post-Bid
$70,000 est. value
Pittston, ME

Last Updated 05/16/2022 03:54 AM
Project Title

Pavement Milling, Cyclical Pavement Resurfacing with Drainage and Safety Improvements

Physical Address View project details and contacts
City, State (County) Benton, Clinton, Waterville, ME   (Kennebec County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Maine Federal Aid Project Nos. 2571700, WIN 25717.00, 2572100, WIN 25721.00, & 2572300, WIN 25723.00. Location: In Kennebec County: Project 2571700 is located on Route 139 in Benton beginning 0.06 of a mile south of Sebasticook Bridge Road and extending west 1.89 miles. Project 2572100 is located on Hinckley Road in Clinton beginning at Route 11 and extending west 1.28 miles. Project 2572300 is located in Waterville on Route 104 beginning 0.03 of a mile north ofWebb Road and extending north 1.68 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents