Similar Projects
Wynne Price Park Lighting Upgrade - City of Shasta Lake
Infrastructure
Conception
$400,000 CJ est. value
Shasta Lake, CA 96019

Moody Creek Bridge Rehabilitation - 6157 - City of Shasta Lake
Infrastructure
Conception
$2,653,000 CJ est. value
Shasta Lake, CA 96019

Shasta County New Jail or Expansion
Addition, Demolition, New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Redding, CA 96001

HSIP Cycle 10 Improvements
Infrastructure
Bidding
$170,290 CJ est. value
Shasta Lake, CA 96019

USACE SPK DBB Construction - Fire Retardant Pit and Taxiway Renovations
Infrastructure
Post-Bid
$100,000,000 CJ est. value
Redding, CA 96002

Storage Capacity Improvements Project
Renovation, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Shingletown, CA 96088

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Juniper School Portable Relocation
Demolition, New Construction, Infrastructure
Results
$487,309 CJ est. value
Redding, CA 96001

Construction of the Boulder Creek Gym Addition
Addition, Demolition, Infrastructure
Construction
$2,930,000 CJ est. value
Redding, CA 96003

La Quinta Inn / Redding
New Construction, Infrastructure
Pending Verification
$5,334,713 CJ est. value
Redding, CA 96003

Bethel Church of Redding
Addition, Renovation, Infrastructure - 36,383 SF
Pending Verification
$14,300,000 CJ est. value
Redding, CA 96003

Flanagan Structure Replacement - 6182 - City of Shasta Lake
Infrastructure
Conception
$1,483,000 CJ est. value
Shasta Lake, CA 96019

Shasta Trinity Unit Headquarters (UHQ)/Northern Region Operations (OPS) - Relocate Facility (New Joint Facility)
Demolition, New Construction, Infrastructure
Post-Bid
$80,574,000 CJ est. value
Redding, CA 96001

Sacramento and Court Street Parking Lot Project
Infrastructure
Results
$319,961 CJ est. value
Redding, CA 96001

RFQ D/B - USACE SPK DB Construction - Maintenance Hangar, Shop, and Building Construction
Demolition, New Construction, Infrastructure - 39,658 SF
Post-Bid
$100,000,000 CJ est. value
Redding, CA 96002

Last Updated 03/03/2023 04:06 PM
Project Title

Relays In Knauf And CV Substations - City of Shasta Lake

Physical Address View project details and contacts
City, State (County) Shasta Lake, CA 96019   (Shasta County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. Project is included in the City of Shasta Lake's FY 2022-2024 Budget CIP. As of March 3, 2023, information regarding a design team or a general contractor is not available. Funding is anticipated in FY 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents