Similar Projects
Highlands Drive Area Waterline Replacement
Infrastructure
Bidding
$1,444,304 est. value
Smyrna, GA 30082

Juliette Water Project Phase 2 Contract 1
Post-Bid
Forsyth, GA 31029

Annual On-Call Water and Sewer Emergency Repair
Term Contract
Post-Bid
Stockbridge, GA

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Heron Bay Force Main D
Post-Bid
Marietta, GA

S.R. 247 20-Inch Water Main
Results
Macon, GA 31202

Clayton Service Line Replacement Project No. 2
Post-Bid
$700,000 est. value
Clayton, GA

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Russell Creek 30-inch Raw Water Pipeline
Post-Bid
Dawsonville, GA

Force Main Replacement Phase 1
Results
Buford, GA 30518

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

Reported 06/21/2022 12:00 AM
Project Title

Pipe and Materials for CDBG Waterline Project

Physical Address View project details and contacts
City, State (County) Clayton, GA   (Rabun County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City has been awarded a Community Development Block Grant for upgrade of the main supply water line and local water lines along S. Main Street from the golf course to Leaning Chimney Drive (the northern intersection). Due to the current economic situation and supply chain challenges, the City desires to purchase the major supplies separately to minimize schedule impacts to the Contractor. Since CDBG and GEFA loan money is being used for this project, materials are being competitively purchased through this ITB.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents