Similar Projects
Symrise Pet Food
New Construction, Infrastructure
Conception
$65,500,000 CJ est. value
Hodges, SC 29653

Ninety Six CPW Business Park Road Water Line Improvements
Infrastructure
Bidding
$222,200 CJ est. value
Ninety Six, SC 29666

Chipley Hall Plaza Renovation
Demolition, Infrastructure, Renovation
Bidding
$560,000 CJ est. value
Greenwood, SC 29649

Reconstruction - Rehabilitation - District 2
Post-Bid

Re-Surfacing and Improvements of Bike and Pedestrian Trails
Infrastructure
Post-Bid
Greenwood, SC 29646

Site Work And Renovations At The J. C. Boozer Recreation Complex
Renovation
Results
$750,000 est. value
Greenwood, Ninety Six, SC 29666

Safety Improvements - District 2
Infrastructure
Results

Greenwood Eye Ambulatory Surgery Center
New Construction, Infrastructure
Pending Verification
$3,984,230 CJ est. value
Greenwood, SC 29646

Dogwood Senior Village Senior Housing Development Phase 1 and 2
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Greenwood, SC 29649

Greenwood Portfolio Preservation - Site Work and Remodel
Demolition, Infrastructure, Build-out
Bidding
$5,000,000 CJ est. value
Greenwood, SC 29646

RFP Design - PTC Health (H)/Science (S) Building Renovations and Expansion
Addition, Renovation, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Greenwood, SC 29646

Local Paving Project 2020-2021
Infrastructure
Results
$771,500 est. value
Greenwood, SC

Renovation of Ninety Six Town Park
Infrastructure
Post-Bid
$400,000 CJ est. value
Ninety Six, SC 29666

Reconstruction/Rehabilitation - District 2
Infrastructure
Results

Reconstruction/Rehabilitation - Greenwood Co
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Greenwood, SC 29646

Last Updated 12/19/2022 11:45 PM
Project Title

SC 34 over Wilson Creek

Physical Address View project details and contacts
City, State (County) Greenwood, SC 29646   (Greenwood County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $5,479,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bridge Replacement As of December 20, 2022, the project is in Conceptual status. Anticipated letting month is December , 2023. SCDOT - SC 34 over Wilson Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents