Similar Projects
Service Street Auto Repair / Cumming
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Cumming, GA 30040

Georgia 400
New Construction, Infrastructure - 907,550 SF
Conception
$90,000,000 CJ est. value
Cumming, GA 30040

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Passport Springs & Spa
New Construction, Infrastructure - 150,000 SF
Design
$30,000,000 CJ est. value
Cumming, GA 30040

Lanier Parkway Booster Pump Station and Water Tank
New Construction, Infrastructure
Bidding
$4,500,000 CJ est. value
Cumming, GA 30040

Resurfacing of the Sawnee Mountain Walking Trails
Infrastructure
Bidding
$200,000 CJ est. value
Cumming, GA 30028

2022 Cumming Utilities Overhead Power Line Removal and Underground Replacement Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Cumming, GA 30040

Cumming Retail
New Construction, Infrastructure - 4,528 SF
Post-Bid
$1,300,000 CJ est. value
Cumming, GA 30040

Construction of a Dog Park on County Way
Results
Cumming, GA 30040

Construction of an Outdoor Firing Range
Results
Cumming, GA 30040

Lanierland Park Phase 2
New Construction - 5,025 SF
Construction
$16,500,000 est. value
Cumming, GA 30041

Harbour Point Entrance
New Construction, Demolition
Construction
Gainesville, GA

Continuum Alpharetta
Addition, Demolition, New Construction, Infrastructure, Renovation - 1,623,499 SF
Pending Verification
$523,000,000 CJ est. value
Alpharetta, GA 30004

Agile Cold Storage Freezer Distribution Hub
New Construction, Infrastructure - 150,000 SF
Pending Verification
$20,000,000 CJ est. value
Gainesville, GA 30507

HUB404
New Construction, Infrastructure
Design
$250,000,000 CJ est. value
Cumming, GA 30041

Last Updated 10/05/2022 03:08 PM
Project Title

Bennett Park Redevelopment - Forsyth County

Physical Address View project details and contacts
City, State (County) Cumming, GA 30041   (Forsyth County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 5, 2022, this project is in the design phase. Information regarding a design team and the contractor selection has not been disclosed. An estimated construction timeline has been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The Forsyth County Procurement Department will accept the following: Architectural & Engineering Services to provide Master Planning of site and Construction Documents for athletic facilities with associated support facilities for: 1) Denmark Park 2) Sharon Springs Park 3) Bennett Park Firms are not required to propose on all parks listed, and the county reserves the right to award the parks separately. Award of proposal will be made at a later date. Forsyth County reserves the right to reject any or all proposals. The method of contractor selection has not been determined at this time. Anticipated construction cost: Denmark Park $12,000,000.00; Sharon Springs Park $8,500.000.00; and Bennett Park $8,500,00.00.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents