Similar Projects
Dehumidifier Unit Replacement at Cornerstone Aquatic Center
Alteration
Bidding
$200,000 est. value
West Hartford, CT 06107

HVAC Contractors for UCH, MSI RTU Replacement
Post-Bid
$1,600,000 est. value
Farmington, CT 06032

HVAC and Mechanical Products
Term Contract
Post-Bid

Air Handling Unit 9 Replacement
Results
Hartford, CT 06106

Avon Free Public Library Replacement of Geothermal System
Results
Avon, CT 06001

B Building Exhaust Noise Reduction
Post-Bid
Farmington, CT

High School Complete Commercial Pool Heater Replacement and Piping
Results
Plainville, CT

Design-Build Services for the Carl E. Allgrove Elementary School Air Conditioning Project
Post-Bid
East Granby, CT 06026

Sage Park Middle School Energy and Efficiency HVAC Upgrades
Results
Windsor, CT 06095

J045--VISN 1 - Pipe-Steam Fitting 5-Year Pop Agreement
Post-Bid
Newington, West Hartford, West Haven, CT - Bedford, Boston, Brockton, Northampton, MA - Augusta, ME 06516

Replacement of Rooftop Heating/Cooling Units at Manchester High School
Results
Manchester, CT 06040

Cleaning and Degreasing of Kitchen Exhaust Systems
Post-Bid
New Britain, CT

Replacement of the Daiken VRF System at Illing Middle School
Results
Manchester, CT 06040

045--Chilled Water Line Repair
Post-Bid
West Haven, CT 06516

HVAC System Maintenance Services for CCSU
Results
New Britain, CT

Last Updated 05/16/2022 10:54 AM
Project Title

HVAC System Replacement

Physical Address View project details and contacts
City, State (County) East Granby, CT 06026   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/22/22
Owner View project details and contacts
Architect View project details and contacts
Description

To improve the air quality and operating efficiency at the library, East Granby Library Association is seeking a qualified HVAC contractor to facilitate the replacement of the current HVAC system in operation. The overall goal of the project is to install an HVAC system that will accept high-quality air filters and other devices to improve the air quality in the building. Building controls need to be upgraded to allow for more efficient operation of the system. The system needs to be responsive to year-round temperature fluctuations in the workplace. The current system is comprised of the following: 1. 6 air handling units 2. 6 condensers 3. 10 reheat coils 4. 2 pumps 5. 1 boiler 6. Building control systems

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents