Similar Projects
Deep Injection Wells No. 3 and No. 4 Pump Station
Infrastructure
Bidding
$83,400,000 est. value
Hollywood, FL 33019

Military Point Advanced Wastewater Treatment Facility Pumps and Motors Replacement Project
Alteration
Bidding
$500,000 est. value
Panama City, FL 32403

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Econfina Creek Raw Water Pump Station Third Pump Addition
Infrastructure
Bidding
Youngstown, FL 32466

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Water Treatment Plant (WTP) and Drinking Water Pump Stations Pump Motors Replacement Project
Infrastructure
Bidding
Panama City, Southport, FL 32404

Well Pump Motor
Post-Bid
Plant City, FL 33564

Raw Water Well #9
Results
Hallandale, FL 33009

New Drinking Well Pumps
Infrastructure
Bidding
Bronson, FL

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

Well 15 South Profile Well and Remediation Well R-4
Results
Hobe Sound, FL 33455

Last Updated 01/17/2022 10:24 PM
Project Title

Northwest Water Reclamation Facility Blowers and Sludge Pump Replacement and System Improvements

Physical Address View project details and contacts
City, State (County) Apopka, FL 32703   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,262,076
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This construction project includes replacement of the existing sludge blowers and modification of air heading piping at the biosolids holding tanks. Replacement of existing sludge transfer pumps, with equal sized new pumps and associated piping. Construction of new electric and control equipment building to house new electrical and instrumentation equipment. Replacement of existing electrical and instrumentation components for sludge pumps and blowers. Installation of air mixers at Biological Nutrient Removal (BNR) basin No. 3 and associated electrical components. Installation of steel platforms on top of the existing fuel tanks, including access stairs and guardrail.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents