Similar Projects
Jacking and Boring Services
Infrastructure
Post-Bid

Crossings Curb Inlet Rehabilitation Project
Infrastructure
Post-Bid
Monroe, OH

Sanitary Sewer Lining
Results
Middletown, OH 45042

Project: CSC-19731 M&R Sanitary Lines Site Wide
Results

6" Sewer Main Cleanout
Infrastructure
Post-Bid
Middletown, OH

North Interceptor Sewer Rehabilitation
Results
Less than $498,333 est. value
Middletown, OH

Sewer Rehabilitation CIPP Lining
Alteration
Post-Bid
$300,000 est. value
Middletown, OH

Combined and Sanitary Sewer Condition Assessment
Term Contract
Results
$1,859,750 est. value
Middletown, OH

Brittany Heights Curb Inlet Rehabilitation
Results
Monroe, OH

Port Union and Lesaint Drive Sewer Replacement/Repair
Results
$624,380 est. value
OH

East High Street (Us 27) Sanitary Sewer Replacement Miami University
Results
$310,000 est. value
Oxford, OH 45056

Oil/Water Interceptor Pumping and Cleaning Service
Term Contract
Results

2021 Sanitary Sewer Lining Project
Results
Hamilton, OH 45026

Wildwood Sewer Lining
Infrastructure
Results
$35,640 est. value
Middletown, OH 45044

Gilmore Ponds Sanitary Sewer and Gas Main Relocation
Infrastructure
Results
Hamilton, OH 45026

Last Updated 05/18/2022 11:53 PM
Project Title

Sewer Rehabilitation - Point Repairs

Physical Address View project details and contacts
City, State (County) Middletown, OH   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes five segments that will need open-cut pipe replacement. 1. Moore St. (MH206_MH191): Replace 17 LF of corrugated metal pipe with 24” Sanitite pipe. Existing point repair is a smaller diameter corrugated metal pipe. Defect begins at approximately 43.1’ and continues to 60.7’. 2. Crawford St. (MH233_MH231): Replace 5 LF of corrugated metal pipe with 48” Sanitite pipe. Corrugated metal pipe is broken and with soil visible. Defect begins at 327’ and terminated at the downstream manhole (332.5’). 3. Crawford St. (MH141_MH138): Replace 10 LF of corrugated metal pipe with 30” Sanitite pipe. Corrugated metal pipe is broken with soil visible. Defect begins at approximately 153.8’ and continues to 157’. 4. Lefferson Ave. (MH2477_MH2476): Replace 5 LF of corrugated metal pipe with 36” Sanitite pipe. Install two Weko Seals, one on each end of pipe replacement. Corrugated metal pipe has bulging inverse curvature at the 12 o’clock position. Defect beings as 47.8’ and continues to 49.5’. 5. Superior Ave. (MH377_MH375): Replace 110 LF of vitrified clay pipe with 18” Sanitite pipe. Replace pipe to nearest joint and seal. Vitrified clay pipe has multiple hinged cracks, fractures, and broken pieces. Defect begins at MH 377 and continues until 110’.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents