Reported | 04/13/2022 12:00 AM |
Project Title | East Science MV Electrical Loop Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Eugene, OR 97403 (Lane County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV cables and all associated equipment and components for connecting existing FDR5, FDR7 and SBF3 MV switches located in the basement of Knight Campus to new MV switches to be located on the north side of Streisinger, perform all required testing, coordination and energize the new service. Alternate #1 is to re-feed LISB normal power from new MV FDR5 switch and standby power from new MV SBF3 switch, and Alternate #2 is to re-feed Willamette and Streisinger normal power from new MV FDR7 switch. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |