Similar Projects
Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

Johnston's Bakery Frozen Dough Facility Expansion
Addition, Demolition, Infrastructure - 10,450 SF
Design
$1,000,000 CJ est. value
Sheboygan, WI 53081

Road and Parking Lot Improvements - Kohler Andrae State Park
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Road and Parking Lot Improvements - Kohler Andrae State Park
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CTH V Phase 2
Infrastructure
Results
Waldo, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Indiana Avenue - Streetscape Improvements - Phase Two of Two
Infrastructure
Conception
$750,000 CJ est. value
Sheboygan, WI 53081

Last Updated 02/28/2023 10:01 AM
Project Title

Olive Garden Way

Physical Address View project details and contacts
City, State (County) Sheboygan, WI 53081   (Sheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $685,482 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of approximately 800 lineal feet of HMA-paved roadway with concrete curb and gutter, 400 lineal feet of sanitary sewer, 25 vertical feet of sanitary manhole structures, 890 lineal feet of storm sewer, 20 storm sewer structures, 425 lineal feet of watermain, 6 valves, and 2 hydrants. This work includes extensive filling and grading, temporary and permanent erosion control, traffic control, and excavation of one clay lined storm water detention facility. Work includes all incidental items necessary to complete the work as shown on the plans and included in the proposal contract. LEGAL PROVISIONS: The Contract letting shall be subject to the provisions of Sections 60.47, 66.0901, and 779.15 of the Wisconsin Statutes. BID SECURITY: Bid Security in the amount of not less than 5 percent of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. BID REJECTION/ACCEPTANCE: OWNER reserves the right to reject any and all Bids, waive informalities in bidding or to accept the Bid or Bids, which best serve the interests of OWNER. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 60 days after the opening of Bids without consent of OWNER.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents