Similar Projects
Cross Church Residential Development
New Construction
Conception
Palm City, FL 34990

Atlantic Fields
New Construction
Conception
Hobe Sound, FL 33455

Kanner Oaks
New Construction
Design
Stuart, FL 34994

Glades Crossing
New Construction
Design
Stuart, FL 34997

Sandsprit Park Boat Ramp Replacement
Infrastructure
Bidding
$1,840,000 CJ est. value
Stuart, FL 34997

Sandsprit Park Boat Ramp Replacement
Infrastructure
Bidding
$1,840,000 CJ est. value
Stuart, FL 34997

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Kanner Highway Mixed Use - Phase IA - Site Development
Infrastructure
Post-Bid
$7,529,703 est. value
Stuart, FL 34994

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Add Lanes and Reconstruct
Results
Less than $21,311,782 est. value
Palm City, FL 34990

The Grove Golf Club - Golf Cottages
New Construction - 14,000 SF
Construction
$6,500,000 est. value
Hobe Sound, FL

Evergreen Homes 47th Avenue
New Construction
Conception
Port Salerno, FL 34997

Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

South Martin Regional Utility Well Maintenance and Rehabilitation
Infrastructure
Bidding
$600,000 CJ est. value
Hobe Sound, FL 33455

Sailfish Cay - Land Development
New Construction, Alteration
Post-Bid
Stuart, FL 34994

Last Updated 08/11/2022 10:05 AM
Project Title

Preserves at Park Trace

Physical Address View project details and contacts
City, State (County) Stuart, FL 34997   (Martin County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $44,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on 97 acres on the south side of SE Cove Road at its intersection with Willoughby Boulevard. As of August 11, 2022, construction is currently under way. No firm timeline as to when construction is expected to be finished.

Details

1 Story Above Grade, Apartments, 114 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents