Similar Projects
Water Main Improvements Phase 3
Infrastructure
Design
$400,000 CJ est. value
Enterprise, AL 36330

MUNI - Site Plan - Main Street / Office - Navigator International, LLC.
New Construction, Infrastructure
Design
Enterprise, AL 36330

Site Improvements at Pinedale, Holly Hill Elementary Schools and Dauphin Junior High School
Infrastructure
Post-Bid
Enterprise, AL 36330

Replacement Of Cove Base Wallace Hall and Lolley Gym
Renovation
Post-Bid
$200,000 est. value
Enterprise, AL 36331

Planing, Resurfacing, and Traffic Stripe on SR-248
Infrastructure
Results
$1,747,878 CJ est. value
Enterprise, AL 36330

Martin Luther King Drive Water Main Replacements
Infrastructure
Results
$665,644 CJ est. value
Elba, AL 36323

Abandonment of Water Supply Well No. 4
Infrastructure
Construction
$50,000 CJ est. value
Enterprise, AL 36330

The Bryan Building
Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Enterprise, AL 36330

Urgent Care Facility
New Construction, Infrastructure - 3,600 SF
Pending Verification
$2,000,000 CJ est. value
Enterprise, AL 36330

Repainting of Classrooms at Wallace Hall and Lolley Gym
Renovation, Infrastructure
Post-Bid
$200,000 est. value
Enterprise, AL

Planing, Resurfacing, and Traffic Stripe on CR-636
Infrastructure
Results
$1,798,406 CJ est. value
Enterprise, AL 36330

Baseball and Softball Complex Renovations Phase 2
Renovation
Post-Bid
$2,000,000 est. value
Enterprise, AL 36330

Toilet Renovations at Lurleen B. Wallace Building
Renovation
Results
$500,000 CJ est. value
Enterprise, AL 36330

Forrester Sewer Line Repairs for Enterprise State Community College
Infrastructure
Post-Bid
$200,000 CJ est. value
Enterprise, AL 36330

Enterprise Market Buildings 100 & 200
New Construction, Infrastructure - 8,660 SF
Post-Bid
$2,000,000 CJ est. value
Enterprise, AL 36330

Last Updated 06/16/2023 11:08 AM
Project Title

Performing Arts Center - Building Package for Enterprise State Community College

Physical Address View project details and contacts
City, State (County) Enterprise, AL 36330   (Coffee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time. The Work of the project includes, but is not limited to: construction of a New Performing Arts Center. and coordination and supervision of the Prime Bid Package Scope of Work including, but not limited to: 1.General Works Package (inclusive of building structure, site work, envelope and finishes) 2. HVAC 3. Plumbing 4. Electrical, Site Lighting & Fire Alarm 5. Fire Protection 6. Theater Seating 7. Stage Equipment and Rigging and Theater Lighting 8. AV 9. Data Communications Cabling & Equipment 10. Electrical Switchgear 11. Mechanical Chillers, AHUs, VAVs, RTUs A cashier's check or bid bond payable to ALABAMA COMMUNITY COLLEGE SYSTEM in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, insurance in compliance with requirements, and verification of E-Verify enrollment will be required at the signing of the Contract. This project is being bid EXCLUDING TAXES, and requires the Contractor comply with the requirements of Act 2013-205, which was signed into law on May 9, 2013. The Contractor and the Owner will be required to apply for Certificates of Exemption with the Alabama Department of Revenue which will handle administration of the Certificates. The Contractor shall account for the tax savings on the Proposal Form. Additional qualifications and requirements for General Contractor Bidders and separate Subcontractors are indicated in the Bid and Contract Documents. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the Owner will thereby be promoted.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents