Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

East Sunnyvale Area Sense of Place
Infrastructure
Bidding
$2,889,580 CJ est. value
Sunnyvale, CA 94087

East Sunnyvale Area Sense of Place
Infrastructure
Bidding
$2,889,580 CJ est. value
Sunnyvale, CA 94087

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

Reconstruction of Curbs Gutters and Sidewalks
Infrastructure
Post-Bid
$1,150,000 est. value
Cupertino, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Last Updated 01/09/2023 11:32 PM
Project Title

Install and / or Update Curb Ramps and Pedestrian Factilities to ADA Standards

Physical Address View project details and contacts
City, State (County) Los Altos Hills, CA 94022   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $6,193,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install and / or Update Curb Ramps and Pedestrian Factilities to ADA Standards Project ID : 0416000020 Bkpm: 18.3 Ahpm : 21.0 Proposed Advertise Date : 04/17/2023 As of January 10, 2023, the project is in Final Planning status. Anticipated construction year is 2023. CADOT - Install and / or Update Curb Ramps and Pedestrian Factilities to ADA Standards *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents