Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Dry Barrel Fire Hydrants (Sheltered Market Solicitation)
Bidding
Tampa, FL

Citywide Meter, Hydrant and Valve Installation and Replacement
Bidding
Tampa, FL

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

Valve Operation and Maintenance Optimization System
Results
Tampa, FL 33602

Davis Islands Water Main Replacement
Results
Less than $5,240,000 est. value
Tampa, FL 33602

CDBG University Square Water Replacement
Post-Bid
Temple Terrace, FL 33617

State Road 39 South Utility Extension
Results
$3,656,566 est. value
Plant City, FL 33564

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Dry Barrel Fire Hydrants
Term Contract
Results
Tampa, FL 33602

Polyethylene Water Meter Boxes and Covers (Sheltered Market Solicitation)
Term Contract
Results
Tampa, FL 33602

Immediate Pipeline Repair and Reconstruction WORCS-11
Results
Less than $1,400,000 est. value
Tampa, FL 33601

Sunset Park Distribution Line Replacement (East)
Results
$2,103,727 est. value
Tampa, FL 33600

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 12/17/2019 07:12 AM
Project Title

Job Order Contracting Services for New Water Meter Service Installations

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, materials and equipment for Minor Projects water meter service installations and/or transfers of 3/4" (single or dual service), 1", 1½", and 2" meters and 2" double detector check valves, as specified. New meter service installations and/or transfers issued to the Contractor through Minor Projects work orders will be independent of pipeline projects, and are generally required by the Department as result of customer applications for water service.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents