Similar Projects
Line Clearance Services
Term Contract, Infrastructure
Bidding
Springfield, IL

Line Clearance Services
Term Contract, Infrastructure
Bidding
Springfield, IL

Fire Hydrants
Post-Bid
Springfield, IL 62701

Hydrated Lime
Term Contract
Post-Bid
Springfield, IL 62701

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Water Distribution System Leak Detection
Results
Springfield, IL 62701

Electric Construction Labor
Alteration
Bidding
Springfield, IL

Asbestos Abatement Blanket Contract
Term Contract
Post-Bid
Less than $100,000 est. value
Springfield, IL 62703

East Birch Street Water Main
Renovation
Results
New Berlin, IL 62670

D1 Rapid Set Ready Mix Concrete
Infrastructure
Bidding
Springfield, IL

Hirsch Keyless Entry JRTC and MABB
Term Contract
Post-Bid
Springfield, IL

CISCO Switch Upgrade
Term Contract
Results
Springfield, IL

Elevator Maintenance and Repair
Post-Bid
Springfield, IL 62703

IL Dept. of Agriculture Elevator Repair, Maintenance and Testing
Results
Springfield, IL 62702

Insulation, Lagging and Abatement T&M Maintenance & Repair
Term Contract
Post-Bid
Springfield, IL

Reported 10/15/2021 12:00 AM
Project Title

Water Distribution System Leak Detection

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Completion Expected February 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing water distribution system leak detection services within a specified area of the system. Proposals for four survey areas within the CWLP system are requested. The field team shall listen to all fire hydrants and main line valves within the survey areas. If distances between main valve and hydrant exceed 500 feet, additional listening points, such as services or other points shall be utilized. Two-man teams should be used at all times during the course of the project to help ensure safety and quality assurance. Leaks shall be clearly identified for both mains and services. A detailed report shall be provided indicating the location of any leaks found, photos or diagrams of leak locations, means used to locate the leak and an estimated water loss. Proposal shall include the cost to locate up to two potential or identified leaks outside of the defined survey areas as needed while the field team is on site.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents