Similar Projects
Distribution Center
Demolition - 182,000 SF
Conception
Mebane, NC 27302

The Maintenance Team Building
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

Saltwater Properties, LLC
New Construction - 4,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28401

Sunnyvale Flex Spaces
New Construction - 72,446 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wilmington, NC

Army Reserve Center
New Construction - 42,918 SF
Bidding
$25,000,000 est. value
Asheville, NC

B4505 Repair Fuel Systems
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

AAA Self Storage
New Construction - 65,445 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Durham, NC 27703

Climate Controlled Storage Facility
New Construction - 93,045 SF
Post-Bid
Waxhaw, NC 28173

New Maintenance Garage for Eastern NC School for The Deaf
New Construction - 1,990 SF
Results
Wilson, NC 27893

ODOR Control System for Sludge Holding Tanks, Ocean Sands Wastewater Treatment Plant 200,000 GPD, Phase I
Results
$60,000 est. value
Corolla, NC 27929

Carmel Road Post Office Site
New Construction
Construction
$7,500,000 est. value
Charlotte, NC 28226

DMI Prosperity Crossing Self Storage and Retail
New Construction - 101,733 SF
Construction
$5,000,000 to $6,000,000 est. value
Charlotte, NC 28269

Storage Facility Addition
New Construction, Addition
Pending Verification
Benson, NC 27504

COSMOIND Manufacturing Plants
New Construction - 640,000 SF
Pending Verification
$10,000,000 CJ est. value
Middlesex, NC 28365

Freedom Lawns Office
New Construction, Renovation - 1,530 SF
Conception
Wilmington, NC

Last Updated 06/10/2022 07:21 AM
Project Title

University Lake Permanganate Facility Project

Physical Address View project details and contacts
City, State (County) NC   (Orange County)
Category(s) Commercial, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: The University Lake Permanganate Facility for storage and feed of sodium permanganate at the University Lake site in Carrboro, NC, and all associated work as described in the Specifications and as shown on the Drawings. The project includes a polyethylene bulk storage tank and a concrete secondary containment structure. The new facility includes a concrete frame superstructure with masonry walls and precast plank roof to house the bulk storage tank, chemical metering pumps with VFDs, associated power and control systems, and auxiliary building systems for lighting, HVAC, plumbing, tempered water heater, and fire suppression. The chemical facility includes a remote I/O panel for communication with OWASA’s water treatment plant SCADA system. OWASA’s existing raw water pump station PLC will be programmed to monitor and control the new chemical storage and feed facility. Site work includes erosion control, stormwater improvements, grading, and paving.

Details

Division 01 - General Requirements, Temporary Controls, Temporary Erosion and Sediment Control.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents