Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Design
$54,700,000 est. value
San Jose, CA 95135

CityView Plaza Mixed Use Development
New Construction - 23,277,000 SF
Design
$10,000,000 CJ est. value
San Jose, CA 95113

East Brokaw Road Development
New Construction - 39,100 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
San Jose, CA 95154

Remodel Construction of TJPAMC Transit Administration Building
Renovation - 2,865 SF
Bidding
Merced, CA 95340

Lburrey Office
New Construction, Renovation - 2,735 SF
Sub-Bidding
$500,000 to $1,000,000 CJ est. value
Antioch, CA 94509

Trade Subcontractors for Faculty and Staff Housing Project
New Construction, Renovation - 30,000 SF
Sub-Bidding
$14,000,000 est. value
Sacramento, CA

New Pre-Case Concrete Office Buildings
New Construction, Term Contract - 38,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Livermore, CA

E--(2) Mobile Office Buildings, Deck, Ramp, Stairs
New Construction
Post-Bid
Jolon, CA

Design-Build Project-Tech Park Phase 2
New Construction
Results
$6,750,000 est. value
San Luis Obispo, CA 93405

Stanislaus County Clerk Recorder Office Remodel Project
Renovation
Results
Modesto, CA 95354

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

Arts District Office Building
New Construction - 113,000 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90021

Gateway of Pacific Phase 2 and 3
New Construction
Pending Verification
South San Francisco, CA 94080

Reported 01/07/2022 03:23 PM
Project Title

Liberty Storage

Physical Address View project details and contacts
City, State (County) Lodi, CA 95240   (San Joaquin County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is actually two lots that is divided by one vacant lot. The addresses are 2459 & 2427 Maggio Circle. One lot is just storage buildings (2427 Maggio Circle) and one is storage buildings plus an office building (2459 Maggio Circle).

Details

144,332 SF - 1 Office, Renovation, 2 Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents