Similar Projects
Surfacing/Roadway Restoration Highway:IH410
Bidding
Less than $23,600,072 est. value
TX

Highway Improvement Highway:VA
Bidding
Less than $1,084,790 est. value
TX

2019 Street Maintenance Contract
Post-Bid
China Grove, TX 78263

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

2019-2020 Microsurface Toc Package 1
Results
$3,000,000 est. value
San Antonio, TX

Widen Road - Add Lanes Highway:SL1604
Bidding
$165,766,591 est. value
TX

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Southern Region Disaster Recovery Support BPA
Results

Upper Leon Creek-Government Canyon Regional Rswf
Bidding
Less than $7,410,378 est. value
San Antonio, TX 78205

Ring Road Bent Repairs
Post-Bid
Less than $189,365 est. value
San Antonio, TX

Repair Stanley Road
Results
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

2021-2022 Task Order Contract for Pavement Markings, Package A
Bidding
$3,500,000 est. value
San Antonio, TX

Oakwell Farms 2019 Trail Reconstruction
Post-Bid
San Antonio, TX

2018 Street Preservation and Maintenance Project
Results
Schertz, TX

Last Updated 03/11/2020 08:38 AM
Project Title

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 7

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,037,077
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project construction may include but is not limited to: concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, wheel chair ramps, removing and relocating mail boxes, topsoil, sodding, signage, striping, elevated sidewalks, sidewalk pipe railing, adjusting existing meter boxes, valve boxes and manholes, tree pruning, removal and/or replacement, and any other items required due to the site conditions to accomplish the project scope. Quantities included in this contract, as well as the entire bid amount are not guaranteed. Unit prices established shall remain valid throughout the duration of the contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents