Similar Projects
Reported | 01/14/2022 03:58 PM |
Project Title | Pest Control Services- Naval Submarine Base New London |
Physical Address | View project details and contacts |
City, State (County) | Groton, CT (New London County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items required to perform pest control services at Naval Submarine Base New London in Groton, Connecticut and associated facilities in New London and Stonington, Connecticut. The Government’s integrated pest management (IPM) program is intended to emphasize surveys, establish control thresholds, and maintain documentation to track the effectiveness and safety of control efforts. IPM may include techniques such as education, habitat modification, biological control, genetic control, cultural control, mechanical control, physical control, regulatory control, and where necessary, the judicious use of least-hazardous pesticides. Pesticides, when needed, shall be selected consistent with IPM principles in order to minimize negative impacts on human health and the environment. The Contractor shall perform pest control services in conformance with the Integrated Pest Management Plan (IPMP) to prevent and control the following pests: --Nuisance, structure damaging, and disease vector and health arthropod and invertebrate pests cockroaches termites bees wasps ants fleas silverfish stored product pests mosquitoes bedbugs --Vertebrate pests mice rats bats feral dogs and cats other nuisance mammals pigeons and other nuisance birds The work identified is to be provided by means of a combination Firm-Fixed Price (recurring work)/Indefinite Quantity (non-recurring work) type of contract. Source Selection procedures will be used to select the proposal that is the lowest priced technically acceptable (LPTA). The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to have the lowest price while being technically acceptable. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |