Similar Projects
Aggregate and Anti-Skid
Term Contract
Bidding

Bridge and Highway Maintenance Materials
Term Contract
Bidding

Aggregate
Post-Bid
Freedom, PA

#8 Millings for Beaver County
Term Contract
Post-Bid
PA

Asphalt Materials
Bidding

Bituminous Materials, Plant Mix
Post-Bid

Limestone/Seal Bituminous Coat
Bidding
Darlington, PA

Limestone/Seal Bituminous Coat
Post-Bid
Darlington, PA 16115

Road Aggregates
Bidding
Monaca, PA

Road Materials
Term Contract
Post-Bid
Aliquippa, PA 15001

Road Aggregates
Post-Bid
Monaca, PA 15061

Kelsall Road Dirt Gravel Road Project
Post-Bid
Unionville, PA 19375

Road Materials
Post-Bid
Fombell, PA 16123

2A Limestone
Post-Bid
Beaver Falls, PA

2A Limestone
Post-Bid
Darlington, PA

Reported 10/10/2020 12:00 AM
Project Title

Surplus River Sand & Gravel and Concrete Demolition Rubble Available for Industry Use

Physical Address View project details and contacts
City, State (County) Monaca, PA 15061   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF THE PROPOSED ACQUISITION: The U.S. Army Corps of Engineers (USACE), Pittsburgh District is planning to replace the existing 56’ x 360’ auxiliary lock chamber with a new 110’ x 600’ main lock chamber at Montgomery Locks & Dam. Preliminary designs estimate that the construction will generate roughly 650,000 cubic yards of dredge material, 125,000 cubic yards of stone material, and 90,000 cubic yards of concrete rubble. The Government is surveying the market to determine the level of interest of the local construction industry in obtaining this material for its use. The Government does not intend to acquire real estate or make available any real estate to facilitate the handling or processing of these materials. Composition of Dredged River Sediments: In general, the dredged material includes cobbles/boulders, gravel, sand and silt/clay. Based on soil test results, the average percentages of gravel, sand & silt/clay are: Gravel: 36 % Sand: 47 % Silt & Clay: 17% Refer to attached summary table for minimum & maximum percentages of gravel, sand and silt/clay. Cobbles and boulders were encountered at a few borings. Refer to the attached summary table for the presence of cobbles/boulders at borings. Attachments (combined as one (1) document): Boring Locations Plans Summary of Laboratory Testing Results and Presence of Cobbles/Boulders Core Box Photos Showing Boulders Geological Profiles/Sections

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents