Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Buildings B-27 - B-29 Renovations Camp Dodge, Johnston, Iowa
Demolition, Infrastructure, Renovation - 1,350 SF
Results
$1,196,601 CJ est. value
Johnston, IA 50131

Buildings B-27 - B-29 Renovations Camp Dodge, Johnston, Iowa
Demolition, Infrastructure, Renovation - 1,350 SF
Results
$1,196,601 CJ est. value
Johnston, IA 50131

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Pending Verification
$5,250,000 CJ est. value
West Des Moines, IA 50265

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

South Area Trunk Sewer - Western Extension Segments 3 and 8
Infrastructure
Post-Bid
$17,781,000 CJ est. value
Des Moines, IA 50315

Last Updated 08/22/2023 03:38 PM
Project Title

Oralabor Gateway Trail-State Street Separated Crossing - SDW-19-001 - City of Ankeny

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50021   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a grade-separated crossing (bridge or tunnel) for the Oralabor Gateway Trail at the intersection of SW State Street and SW Oralabor Road. The proposed grade-separated crossing will span the south leg of the intersection. A study will be completed in 2021 to determine the preferred alternative (bridge or tunnel) for the crossing. Also, the development of this project will need to be coordinated with the SW Oralabor Road & SW State Street Intersection Safety Improvements project which has the same proposed schedule. The Oralabor Gateway Trail is a regional trail connection between the Neal Smith Trail system (to the west) and the Gay Lea Wilson Trail system (to the east). The trail is a 10 wide PCC trail that runs along the south side of SE/SW Oralabor Road across the south side of Ankeny. The trail is very popular with recreational users and commuters. The current at-grade crossing at SW State Street is overly wide due to the rural environment and granular shoulders on SW State Street. The street approach and the intersection as a whole carries extremely large traffic volumes. This includes a high number of right-turning vehicles. This results in an at-grade trail crossing that is difficult to maneuver and has a higher probability of accidents between vehicles and pedestrians. A grade-separated crossing at this location would eliminate this situation. To date, the project has received $800,000 of STBG-TAP funding from the Des Moines Area MPO for construction in 2023. SW State Street and SW Oralabor Road (IA Highway 415 & 160) are joint jurisdictional streets with the Iowa DOT, so the project will need to be coordinated with them. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of December 12, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents