Similar Projects
Last Updated | 01/10/2020 10:42 AM |
Project Title | Breakwall Repair – DeTour State Harbor Boating Access Site (BAS) |
Physical Address | View project details and contacts |
City, State (County) | De Tour Village, MI 49725 (Chippewa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The removal of the existing failing timber bulkhead wall, repair of the breakwall slope with armor stone revetment, and construction of ADA-compliant stone walking path. This will involve the installation of soil and erosion control measures; removal of any impeding trees or vegetation; grubbing, fill, and grading of the breakwall embankment as needed; installation of stone revetment; construction of stone walking path; and site restoration (i.e. placement of topsoil, seed and mulch). |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |