Similar Projects
Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Construction of an Improved Dock Facility at Rock Harbor, Isle Royale National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Houghton, MI

Drain Cleaning
Results
Monroe, MI

C.M.Pipe
Results
Less than $24,166 est. value
Caro, MI

Apparatus Floor, Grates and Drains Repair
Post-Bid
Ypsilanti, MI 48197

Cherry Street Culvert Replacement
Results
Less than $82,081 est. value
Ishpeming, MI

Lake Superior Shoreline Restoration
Post-Bid
Marquette, MI

Heidtman Road Culvert Replacement
Results
Less than $77,008 est. value
Ishpeming, MI

Chinook Pier Angled Dock
Post-Bid
Grand Haven, MI 49417

D Drive N Culvert Replacement
Results
Less than $543,180 est. value
Marshall, MI 49068

Right of Way Services
Post-Bid
MI

Various Lapeer County Hma Paving Projects
Results
Less than $957,972 est. value
Lapeer, MI 48446

Independence Oaks Floating Dock Materials
Post-Bid
Clarkston, MI 48348

Foundation Stabilization Repair for Piers 2, 4, 6, 8 and 10 on Grosse Ile Parkway Bridge
Results
MI

Saint Clair County River Shoreline Armoring
Post-Bid
Port Huron, MI 48060

Last Updated 01/10/2020 10:42 AM
Project Title

Breakwall Repair – DeTour State Harbor Boating Access Site (BAS)

Physical Address View project details and contacts
City, State (County) De Tour Village, MI 49725   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal of the existing failing timber bulkhead wall, repair of the breakwall slope with armor stone revetment, and construction of ADA-compliant stone walking path. This will involve the installation of soil and erosion control measures; removal of any impeding trees or vegetation; grubbing, fill, and grading of the breakwall embankment as needed; installation of stone revetment; construction of stone walking path; and site restoration (i.e. placement of topsoil, seed and mulch).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents