Similar Projects
Last Updated 08/23/2021 01:33 PM
Project Title

Christina Drive and Higgins Road Improvements

Physical Address View project details and contacts
City, State (County) East Dundee, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include intersection signalization, additional left and right turn lanes, and reconstruction of Christina Drive. Intersection Improvement w/ Hot-Mix Asph. Surf. Cse., Il-9.5 Mix d, n50 (130 Ton), Incl. 570 Ton Hma Bc Il-19.0, n50, Various Quantities Of Bit. Mat`l. (Tack Ct. & Pr. Ct), 1600 Lf Perimeter Erosion Bar, 3969 Sy Erosion Contr. Blanket, 0.85 Acre Seeding, Class 1a, 920 Cy Topsoil Exc & Plac, 31 Sy Geotech. Fab. f/Gr Stab., 3800 Cy Earth Excavation, 73 Lb Of Potassium Fert. Nutr., Phosphorus Fert. Nutr., & Nitrogen Fert. Nutr., 1710 Sf Conc. Median Surf 4, 50 Cy Non Spl. Wate Disposal, 1 Each Soil Disposal Analy., 1 l Sum Traffic Control & Protection, Std. (701326, 701501, 701601, 701701), 11 Lf Light Pole Fdn 24d, 2 Each Rem. Pole Fdn, Assorted Drainage Appurtenances, Etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents