Similar Projects
San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Southern Region Disaster Recovery Support BPA
Results

2020 Road Rehabilitation Project
Results
Less than $373,000 est. value
Vidor, TX 77662

Street Improvements
Results
$239,000 est. value
West Orange, TX 77630

SFT - Safety Improvements
Results
Less than $1,210,852 est. value
TX

SFT -Safety Improvement Projects
Results
Less than $578,696 est. value
TX

Surfacing / Roadway Restoration
Results
Less than $9,908,305 est. value
TX

2019 Bond Program Streets South of I-10 Phase 2
Results
Less than $195,544 est. value
Orange, TX 77630

Eagle Point Parkway and Medical Center Drive
Results
$1,500,000 est. value
Orange, TX 77630

Intersection Improvement Highway :FM1006
Results
$597,313 est. value
TX

2021 Group Seal Coat Program
Results

FM1006-Flexible Pavement Structure Repair
Infrastructure
Results
$1,157,596 est. value
TX

SH 87-Surfacing/Roadway Restoration
Infrastructure
Results
$2,535,803 est. value
TX

Construction of the LCM Middle School Back Drive HMAC Rehabilitation
Infrastructure
Results
Orange, TX 77632

Street Repairs for Gary Street, Franklin Street and Professional Drive
Infrastructure
Results
$161,135 est. value
Bridge City, TX 77611

Last Updated 11/11/2021 07:54 AM
Project Title

Eagle Point Parkway and Medical Center Drive - Phase 1

Physical Address View project details and contacts
City, State (County) Orange, TX   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,440,669
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of subgrade lime stabilization, asphalt stabilized base, cement treated base, compacted select fill, storm inlets and HDPE storm lines, storm detention/retention holding ponds and outfall structures, cement treated base, 8-inch reinforced concrete pavement and curb, 9-inch continually reinforced concrete pavement and curb, water lines, sanitary sewer lines, and other associated work, traffic control signs & markings, erosion control devices, seeding, and performing site restoration and cleaning up the project for Eagle Point Parkway & Medical Center Drive Phase 1 within the City of Orange. Entire Project shall be completed within 180 total days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents