Similar Projects
Rainbow Distributors Warehouse & Distribution Facility
New Construction
Conception
Sanford, FL

Chantal Lane Office Warehouse
New Construction - 21,200 SF
Conception
$1,000,000 est. value
Sanford, FL 32771

Fastenal Warehouse and Office
New Construction - 142,200 SF
Design
Sanford, FL 32773

I-4 Industrial Park Lot 7 - Office/Warehouse
New Construction - 21,200 SF
Design
$1,000,000 est. value
Sanford, FL

Construction of Sunrail Station Bicycle and Pedestrian Connectivity Improvements
Infrastructure
Post-Bid
$8,900,000 est. value
Altamonte Springs, FL

Harvest Time International / Sanford
New Construction, Infrastructure - 30,092 SF
Post-Bid
$10,000,000 CJ est. value
Sanford, FL 32771

Milling and Paving
Infrastructure
Results
$1,200,000 est. value
Lake Mary, FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Village Grande Climate-Controlled Storage
New Construction - 100,032 SF
Construction
$6,040,494 est. value
Altamonte Springs, FL 32714

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

STEM Building B - Seminole State College
New Construction, Infrastructure - 111,775 SF
Conception
$48,564,418 CJ est. value
Altamonte Springs, FL 32714

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Slovak Gardens Exhibits Cottages
Demolition, New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Winter Park, FL 32792

Last Updated 07/07/2023 02:02 PM
Project Title

Tuskawilla Self Storage

Physical Address View project details and contacts
City, State (County) Winter Springs, FL 32708   (Seminole County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $12,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a 3 story, 100,500-square-foot building, a 1 story 3,900-square-foot building, a 1 story 5,250-square-foot building and a 1 story 6,750-square-foot building with 75 units on 4.82 acres southeast of the intersection. As of July 7, 2023 the project is in planning stage and seeking rezoning and master development approval from the Seminole County Board of Commissioners. A meeting has not yet been scheduled. The Planning and Zoning Commission recommended approval on May 3, 2023. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been disclosed, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

100,500 SF - 3 Stories Above Grade, 100,500 SF. 1 Story Above Grade, 15,900 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents