Similar Projects
Last Updated | 07/27/2020 04:24 PM |
Project Title | Welaunee Boulevard Segment 3A and Segment 2 Turn Lanes Construction Project |
Physical Address | View project details and contacts |
City, State (County) | Tallahassee, FL 32308 (Leon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 03/30/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project will include, but is not limited to, provision of the construction, labor, materials and equipment necessary for the construction of the Project which includes all construction related to Welaunee Blvd Segment 2 turn lanes for entrance into Holy Comforter (2 150` left turn lanes, the Church`s second entrance, and all associated drainage) and the portions Segment 3A (0.45 miles of road with 2 roundabouts, water, sewer, and 12 foot multi-use path along both sides of the road) shown in the plans and all referenced specifications, including but not limited to clearing, grubbing, earthwork, stabilization, base, asphalt, striping, signage, sidewalks/paths, grassing and testing required to install the roadway infrastructure |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |