Similar Projects
Roadway Minor Rehab - SR 2
Infrastructure
Design
$7,962,250 CJ est. value
Huron, OH 44839

SR 2 - Bridge Preservation
Infrastructure, Renovation
Design
$12,320,000 CJ est. value
Huron, OH 44839

Precast Reinforced Concrete Box Culvert, Bardshar Road Culvert Ma-209
Infrastructure
Post-Bid
$55,000 CJ est. value
Perkins Township, OH 44870

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Cleveland Road Lighting
Alteration
Results
$358,740 est. value
Huron, OH

Kelleys Island Glacial Grooves Erosion Protection Bid Package 2 - Site Improvements (Erie County)
Infrastructure
Results
$1,590,000 est. value
Kelleys Island, OH 43438

Cedar Point ESports Arena
New Construction, Infrastructure
Pending Verification
$28,000,000 CJ est. value
Sandusky, OH 44870

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Lighting - D03 LG FY2022(A)
Infrastructure
Results

US 6 - Resurfacing, Undivided System
Infrastructure
Design
$1,376,450 CJ est. value
Sandusky, OH 44870

2022 Old Railroad Road Resurfacing from Bogart Road North to Mills Creek Bridge
Infrastructure
Results
$112,350 CJ est. value
Sandusky, OH 44870

2020-2023 Seasonal Dock Installation and Removal
Infrastructure
Design
$100,000 CJ est. value
Sandusky, OH 44870

Mill Street Improvements
Infrastructure
Results
$249,715 CJ est. value
Berlin Heights, OH 44814

Bridge Preservation - US 6
Infrastructure
Design
$3,040,000 CJ est. value
Sandusky, OH 44870

Intersection Improvement (Safety)
Infrastructure
Design
$2,722,485 CJ est. value
Sandusky, OH 44870

Last Updated 10/21/2022 07:07 PM
Project Title

2022 Traffic Signals In Perkins Township, Erie County, Ohio

Physical Address View project details and contacts
City, State (County) Sandusky, OH 44870   (Erie County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $99,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, material, tools and transportation for the following described improvement: 2022 Traffic Signals in Perkins Township, Erie County, Ohio. All businesses, including minority owned, female owned, or small businesses are encouraged to submit bids. Specifications may be examined at the Erie County Engineer s Office, 2700 Columbus Avenue, Sandusky, Ohio. Documents can be shipped via UPS upon bidder providing UPS account number. Please issue two separate checks. Checks shall be payable to Erie County Engineer s Office. If bidder fails to pay the deposit, the bid will not be accepted . The bid guaranty may be of two forms: A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) A certified check, cashier's check or a letter of credit pursuant to Chapter 1305 of the Ohio Revised Code in the amount of 10% of the bid drawn in favor of the Erie County Commissioners. If the Contract is awarded, a Contract Bond will be required, which is one hundred per cent (100%) payment and performance bond. No bidder may withdraw his bid within 60 days after the actual date of bid opening. Where there is reason to believe that collusion exists among bidders, the bids of those involved will be rejected. Bidders are advised t hat Section 5719.042 of the Ohio Revised Code provides that no contract shall be awarded until the successful bidder submits a statement informing the County Auditor of any delinquent personal property taxes owed to Erie County. Seal and endorse your bid, 2022 Traffic Signals in Perkins Township, Erie County, Ohio. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than April 28, 2023. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor s Executive Order of 1972, and Governor s Executive Order 84-9 shall be required. Bidders must comply with the prevailing wage rates on Public Improvements in Erie County, Ohio as determined by the Ohio Bureau of Employment Services, Wage and Hour Division, (614) 644-2239.online. Each bidder shall strive to meet a goal of 25 percent of the labor used on the project, to be residents of Erie County, Ohio. Each bidder shall strive to meet a goal of 25 percent of all materials and supplies, used on this project, be purchased from Erie County, Ohio vendors and/or suppliers . Domestic steel use requirements as specified in section 153.011 of the Revised Code apply to this project. Copies of section 153.011 of the Revised Code can be obtained from any of the offices of the Department of Administrative Services. Failure to complete the work within the time specified in the proposal will be cause for liquidated damages to be deducted by the County in accordance with the schedule listed in Section 108.07 of the State of Ohio Department of Transportation specifications. The successful bidder shall enter into a contract that includes all requirements contained in the bid specifications.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents