Similar Projects
Kraft Rail Shed
Addition
Conception
$2,183,950 est. value
Champaign, IL 61821

Phillips Recreation Center Roof Replacement
Infrastructure
Bidding
Urbana, IL 61801

North Campus Chiller Plant - Cooling Tower Replacement
Alteration
Bidding
Urbana, IL 61801

Roofing Envelope Services
Post-Bid

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Multiple Roof Replacement
Renovation
Results
Rantoul, IL 61866

Replace Roofing Systems Statewide, Phase I
Results
Less than $2,000,000 est. value

Spectrum Warehouse
New Construction - 83,000 SF
Construction
$7,850,401 est. value
Champaign, IL 61822

Retail and Storage Area
New Construction
Pending Verification
$1,142,800 est. value
Champaign, IL 61821

Roofing Repair and Maintenance
Post-Bid

2020 Salt Shed
Results
Rantoul, IL 61866

Replace Roofing System and Repair Masonry
Alteration
Post-Bid
Less than $2,000,000 est. value
Champaign, IL 61820

Salt Containment Structures at Fithian, Leverett, and Tuscola Facilities
Results

FY21 UCSD Roof Repairs - Station A at Northeast Treatment Plant (NEP)
Results
Urbana, IL 61802

Indoor Aquatic Center Roof Replacement
Results
Less than $133,600 est. value
Urbana, IL 61801

Last Updated 07/28/2021 01:54 PM
Project Title

Asphalt Shingle and EDPM Rubber Roof Membrane Replacement

Physical Address View project details and contacts
City, State (County) Urbana, IL 61802   (Champaign County)
Category(s) Commercial, Single Trades
Sub-Category(s) Roofing, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BROOKENS ADMINISTRATION CENTER ROOF REPLACEMENT: -Remove existing single ply roofing system completely down to roof deck. -Remove existing flashing and copings where indicated on drawings. -Install EPDM single-ply roof system over rigid insulation and cover board. -Install metal flashings. SALT DOME / BRINE SHED: -Remove existing asphalt shingle system and underlayment completely down to roof deck. -Remove existing flashing where indicated on drawings. -Install roof inderlayment and asphalt shingle system. -Replacement of wood fascia.

Details

Warehouse/Storage, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents