Similar Projects
Glass Replacement
Alteration
Bidding
Humble, TX

Replace Door
Post-Bid
Houston, TX 77002

Window Replacements at Multiple Campuses
Post-Bid
$627,000 est. value
Houston, TX 77072

Window Covering Material and Installation
Term Contract
Results
Less than $50,000 est. value
Pasadena, TX 77502

College-Wide Access Controls
Results
$1,000,000 est. value
Pasadena, TX 77501

SJC Central Campus Classroom Building Glass and Glazing and Drywall
Post-Bid
Pasadena, TX 77501

Classroom Window Safety Film
Term Contract
Results
$340,000 est. value
Pearland, TX 77588

Birch Doors
Post-Bid
Houston, TX 77251

Window Glazing Replacement
Results
$1,150,000 est. value
Pasadena, TX 77505

North Campus 7 8 9 and 10 Window Replacement
Post-Bid
Houston, TX 77000

Glass Repair Service (Building)
Results
Less than $75,000 est. value
Houston, TX

Building and Vehicle Replacement Glass
Term Contract
Post-Bid
Houston, TX 77072

Automatic and Push Button Doors
Results
Angleton, TX 77515

Automatic Door Preventative Maintenance, Testing and Inspection Services
Post-Bid
Houston, TX

Formal - Warehouse Door Repair Services at Turning Basin Terminal
Results
Houston, TX

Reported 05/29/2021 12:00 AM
Project Title

Codable Keyless Keypad Door Locks & Installation

Physical Address View project details and contacts
City, State (County) Houston, TX 77030 (Brazoria, Harris Counties)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract will provide the Education Service Line with 2 Coded Keyless Door Locks, to include the ability to enter a numbered code for entry, to replace existing keyed locks on two separate doors in the facility. The coded key-pad replacements shall be placed on training area doors in locations, Room 2B-285 (2nd floor) and 5B-215 (5th floor). Contractor is to meet or exceed what is required by this statement of work to complete the requirement. All new work shall be maintained in a clean condition. The work shall be properly secured, consistent in quality, fit and installation, repair and servicing. The Contractor shall provide all labor, equipment, materials, testing, transportation, and any other materials or services necessary to provide and install the coded keypads.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents