Similar Projects
Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

Southwest 44th Avenue Extension Phase 1
Infrastructure
Bidding
$500,000 CJ est. value
Ocala, FL 34480

Southwest 44th Avenue Extension Phase 1
Infrastructure
Bidding
$500,000 CJ est. value
Ocala, FL 34480

Marion County Public Schools - Central Warehouse
New Construction, Infrastructure - 60,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Ocala, FL 34479

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Asset Maintenance Marion County
Results
$17,701,000 est. value
FL

Ridgewood Park 1st, 2nd and 3rd Addition Road Assessment
Results
$250,000 est. value
FL

SR 40 from CR 314 A to Levy Hammock Road - Florida Department of Transportation
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Woods and Lakes, FL 32179

SR 40 from CR 314 A to Levy Hammock Road - Florida Department of Transportation
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Woods and Lakes, FL 32179

AutoZone #6505 / Silver Springs
New Construction, Infrastructure - 6,000 SF
Design
$1,500,000 CJ est. value
Silver Springs, FL 34488

NW Hwy 225 Resurface (N Hwy 329 to W Hwy 318)
Infrastructure
Bidding
$1,799,000 CJ est. value
Reddick, FL 32686

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 09/09/2022 12:34 AM
Project Title

Cedar Hills Combined MSTU Road Improvement and MCU Lift Station and ForceMain Project

Physical Address View project details and contacts
City, State (County) Ocala, FL 34471   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,090,708 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

MSTU/Assessment needs resurfacing of approximately 4.05 miles of minor local road section in the Cedar Hills Subdivision. MCU needs installation of gravity sanitary sewer, sanitary services and road and driveway restoration. This project involves resurfacing of approximately 4.05 miles of minor local road sections in the Cedar Hills Subdivision. Resurfacing work is to include pavement preparation, crack sealing, leveling, shoulder removal, minor clearing and grubbing, temporary striping, permanent thermoplastic striping, and stabilizing all areas disturbed during construction. Project also involves the installation of a forced water main originating from an existing Water Treatment Plant to SE 38th Street. Actual route shown on attached plan set. CONTRACT TERM This contract will be in effect for 90 days from the date of the NOTICE TO PROCEED. The NOTICE TO PROCEED will not be issued until all required documentation is received by the COU (FY 20/21-765CED553) last day for Questions (LDQ) 05/18/2022 PROJECT BUDGET/FUNDING SOURCE: $1,090,708.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents