Similar Projects
Drainage Repairs - Phase 1 - BDL
Infrastructure
Bidding
Windsor Locks, CT

Trench Restoration 2021
Post-Bid
Southington, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Springside Avenue Drainage Outfall Replacement
Results
East Hartford, CT 06108

Pequabuck River Conduit - Culvert Rehabilitation
Results
Bristol, CT 06010

Drainage Improvements - 2021 Mill and Pave Project
Infrastructure
Post-Bid
Suffield, CT

Flood Control System Main Street Levee Closure Structure Repairs
Results
Hartford, CT

Detention Pond Inspection and Cleaning
Infrastructure
Post-Bid
Southington, CT

2021 Storm Drainage Installation and Repair
Term Contract
Results
West Hartford, CT

Thompsonville Road/Cassotta Lane SSES Pipeline Rehabilitation
Infrastructure
Post-Bid
Suffield, CT 06078

Roadway Reconstruction/ Storm Drainage and Miscellaneous Work at Various Locations
Results
Bristol, CT

Silver Creek East Branch Channel Restoration Project
Infrastructure
Post-Bid
Bristol, CT

Retaining Wall Replacement at Memorial Boulevard
Infrastructure
Results
Bristol, CT

Storm Drainage and Sidewalk Ramp Rehabilitation
Infrastructure
Results
Glastonbury, CT 06033

Installation of Hydrodynamic Separator at Pine Lake
Infrastructure
Results
Bristol, CT

Reported 03/29/2022 12:00 AM
Project Title

On Call Drainage Preparation

Physical Address View project details and contacts
City, State (County) Rocky Hill, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract items include but are not limited to the removal of curb; removal, resetting and installation of catch basins, tops and hoods; installation of lawn drains and drainage pipe and pavement repair.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents