Similar Projects
Hartman Sports Complex - 23882 - City of Aztec
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
Aztec, NM 87410

Hartman Sports Complex - 23882 - City of Aztec
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

RFP - San Juan Lateral Water Treatment Plant (SJLWTP)
New Construction, Infrastructure
Bidding
$350,000,000 CJ est. value
Waterflow, NM 87421

Roadway Reconstruction and Rehabilitation, Bridge Replacement, ITS, Lighting
Demolition, New Construction, Infrastructure
Bidding
$9,000,000 CJ est. value
Farmington, NM 87401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construct the Red Valley Transfer Station Access Road Project
Infrastructure
Post-Bid
NM

20th Street Project Phase III
Infrastructure
Results
$931,920 est. value
Farmington, NM

Kirtland Schools Walk Path Phase II Improvements
Infrastructure
Results
$708,253 est. value
Kirtland, NM 87417

Welding Facility San Juan College
New Construction, Renovation, Infrastructure
Pending Verification
$650,000 CJ est. value
Farmington, NM 87401

Broadway Bridge Repairs - 36701 - City of Farmington
Infrastructure, Renovation
Conception
$425,000 CJ est. value
Farmington, NM 87401

North Main Avenue Extension - New Mexico Department of Finance and Administration
Infrastructure
Design
$3,000,000 CJ est. value
Aztec, NM 87410

County Road 6100 Cold Milling Services
Infrastructure
Post-Bid
Kirtland, NM 87417

Rainbow Boulevard Improvements Project
Infrastructure
Results

Last Updated 04/27/2023 10:20 AM
Project Title

Main Avenue Improvements - 36375 - City of Aztec

Physical Address View project details and contacts
City, State (County) Aztec, NM 87410   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $3,558,838 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To plan, design, construct roadway, pedestrian and plaza improvements, and equip and furnish pedestrian areas along Main Avenue for the City of Aztec, New Mexico, San Juan County. The City Commission adopted a Metropolitan Redevelopment Area Downtown Plan (MRA) in June 2018. The MRA Plan presents a community vision for the future of Downtown Aztec and identifies specific redevelopment projects. Redevelopment identified in this project include a road diet (infrastructure, and landscaping), the Public Plaza reconstruction, signage (gateway, & directional signs, kiosks, sidewalk markers) street resurfacing, curb & gutter replacement, sidewalk and ADA improvements, and bike racks and bike infrastructure, and downtown lighting. Project process includes: Design including studies as may be required by NM Department of Transportation, coordination with other entities involved in project and construction. In accordance with the State of New Mexico Procurement Code, a RFP will be issued for design and construction management services and formal bid(s) issued for construction. As of April 27, 2023, this project is currently in the FY 2023-2027 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents