Similar Projects
Historic City Hall Renovations
Renovation
Conception
Manitou Springs, CO 80829

New Fire Station and City Hall
New Construction
Conception
Steamboat Springs, CO 80487

Old County Courthouse Rehabilitation
Renovation
Design
CO

East Nottingham Park Improvements
Renovation
Design
Avon, CO 81620

Main Distribution Center Replacement - City Hall
Renovation
Bidding
Fort Collins, CO 80521

Police and Courts Office Renovation
Renovation
Bidding
Loveland, CO 80537

On Call Contractors for Various Trades
Renovation
Post-Bid
CO

Office of The Municipal Public Defender Remodel
Renovation
Post-Bid
CO 80204

Criminal Justice Center Lobby and Locker Room Renovations
Renovation
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Construction Services to Complete the Basement Finish of the City of Louisville Police and Courts Building
Results
Louisville, CO 80027

Construction Manager Services for the New Archuleta County Combined Courts Facility
New Construction - 17,000 SF
Construction
CO

General Contractor Services for Chaffee County Assessor Office Remodel Project
Renovation
Construction
Salida, CO 81201

Basalt Town Hall & Police Department
New Construction
Pending Verification
Basalt, CO

NGCC Phase II - New City Hall Building
New Construction
Design
$18,000,000 est. value
Northglenn, CO

Chaffee County Administration Addition
Addition
Bidding
CO

Last Updated 03/25/2022 10:17 AM
Project Title

CTF FCF Improvement Access Phase 1 CM/GC IDP RFP CMS164302

Physical Address View project details and contacts
City, State (County) Canon City, CO 81212   (Fremont County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualifications from firms to provide CM/GC services for the Fremont Correctional Facility (FCF), FCF Improve Accessibility Phases 1 and 2 projects. The FCF Improve Accessibility Phases 1 and 2 projects include, but are not limited to, field verification, implementation of ADA (Americans with Disabilities Act) guideline compliance for offenders with mobility disabilities, selective demolition of existing non-compliant architectural barriers and modifications to doorways, hardware, plumbing fixture, grab bars, railings, floors, ramps, thresholds, cells, fixed tables, etc. for occupied spaces, identified living units, and program accommodations with all associated work for compliance with ADA guidelines and all other applicable codes.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents