Similar Projects
Sweetwater North Drainage Improvement Project - Phase 2
Infrastructure
Bidding
$370,000 est. value
Sweetwater, FL

Marco Canal Culvert Headwall and Embankment Improvement Project
Infrastructure
Bidding
Miami Gardens, FL

Emergency Culvert Replacement at NW 57 Avenue and NW 186 Street - Tropical Storm ETA
Post-Bid
Less than $206,557 est. value
FL

Charles Deering Estate Courtyard Drainage and Structural Improvement
Post-Bid
Miami, FL 33157

Drainage Improvements C-100 Canal Outfalls Retrofit Between SW 98 Ave. and SW 106 Ct.
Results
Less than $693,814 est. value
Miami, FL

Madeleine Village Apartments Seawall Replacement
Results
Less than $530,000 est. value
Miami Beach, FL 33139

Maintenance and Repair Work for City Roads, Streets and Facilities
Infrastructure
Bidding
$220,000 est. value
Aventura, FL

Emergency Response for Storm Drain Cleaning
Infrastructure
Post-Bid
$2,114,372 est. value
FL

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Results
$10,000,000 to $20,000,000 est. value
Miami, FL

Systemwide Drainage Inspection and Maintenance
Infrastructure
Bidding
Miami, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Results
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Northwest 58th Street Outfall
Infrastructure
Bidding
$600,000 est. value
Doral, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Improvements Multiple Sites
Results
Less than $573,862 est. value
Miami, FL 33128

Last Updated 06/29/2022 10:24 AM
Project Title

Drainage Improvements to West 17th Street from 4th to 8th Avenue; West 4th Lane, West 6th Avenue, and West 7th Avenue from 16th to 17th Street

Physical Address View project details and contacts
City, State (County) Hialeah, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, installing, and testing all appurtenances associated with the Drainage Improvements to W 17th St from 4th to 8th Ave; W 4th Ln, W 6th Ave, & W 7th Ave from 16th to 17th St which includes: approximately 3,400 linear feet of roadway and associated drainage system (catch basins, solid pipes, culverts, etc.), sidewalks, street lighting, and pavement markings.

Details

Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents