Similar Projects
Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Southern Crescent Institutional and Independent Living Facility
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
McDonough, GA 30253

Walnut Creek Water Reclamation Facility Expansion to 14 MGD
Addition, Demolition, Infrastructure
Bidding
$900,000 CJ est. value
McDonough, GA 30252

Widening and Reconstruction on SR 20
Infrastructure
Bidding
$10,000,000 CJ est. value
McDonough, GA 30253

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Sewerage System Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
McDonough, GA 30253

Agriculture Meter Installation
Infrastructure
Results

Turner Church Pump Station Force Main Additions
Infrastructure
Results
$1,132,581 CJ est. value
McDonough, GA 30252

Pine Grove Road Warehouse
New Construction, Infrastructure - 1,300,000 SF
Pending Verification
$140,000,000 CJ est. value
Locust Grove, GA 30248

Stanley K. Tanger Multi-Residential
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Locust Grove, GA 30248

RFP D/B - Warren Holder Park Concession/Restroom
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Locust Grove, GA 30248

2022 Road Paving Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Hampton, GA 30228

The Exchange at Locust Grove
New Construction, Infrastructure
Pending Verification
$145,000,000 CJ est. value
Locust Grove, GA 30248

East Hampton Community Park Phase II
Infrastructure
Bidding
$300,000 CJ est. value
Hampton, GA 30228

Caldwell Drive Stormwater Improvements
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Hampton, GA 30228

Last Updated 08/29/2022 07:06 PM
Project Title

Drainage Improvements for Aiken Chafin Lane

Physical Address View project details and contacts
City, State (County) McDonough, GA 30252   (Henry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

sealed bids from qualified vendors for the removal of existing storm drain and installation of storm drain located at Aiken Chafin Lane. The Contractor shall furnish all labor, materials, equipment, and services required to fulfill the terms and conditions of this bid. Bids will only be considered by those bidders and subcontractors currently pre-qualified with the Georgia Department of Transportation. Bids will be opened at the County Administration Building by staff personnel. All Bids shall be accompanied by a Bid Bond in an amount of not less than of the bid for the complete work. The Bid Bond shall be forfeited to Henry County, Georgia as liquidated damages if the Bidder fails to execute the Contract and provide Performance and Payment Bonds within fifteen (15) calendar days after being notified that he has been awarded the Contract. The Bid Bond shall be in the form of a surety issued bond made payable to the Henry County Board of Commissioners. The Surety Company shall be licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A" with a financial size of VI "6" or better. Payment will be made monthly on completed work. Retainage will be held by Owner to a maximum of ten percent (10%) of each progress payment. The Bidder is expected to examine the site(s) of the proposed work, the Proposal Form, Specifications, Supplemental Specifications, Special Provisions and Contract forms before submitting a bid. Qualifications of the Bidder will be reviewed before Award of the Contract. The Work on this project shall be completed within ninety (90) calendar days after receipt of the written Notice to Proceed. All work shall be completed in accordance with Georgia Department of Transportation Standard Specifications Construction Of Transportation Systems, 2021 Edition (as amended). Bids may not be withdrawn for sixty (60) days after the time and date set for closing, except as allowed by OCGA. Henry County reserves the right to reject any and all proposals and to waive any technicalities. This project shall be completed within ninety (90) calendar days after receipt of Notice to Proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents