Similar Projects
Last Updated | 03/06/2023 08:35 AM |
Project Title | Information Systems Facility (ISF), Fort Polk, LA |
Physical Address | View project details and contacts |
City, State (County) | Fort Polk, LA 71459 (Vernon County) |
Category(s) | Commercial, Government/Public, Heavy and Highway |
Sub-Category(s) | Communication Building, Maintenance, Military Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct a standard design Information Systems Facility. Project includes an information system processing area divided into specified security zones that address special use space for a Data Center, Network Operations Center (NOC), Local Session Controller Node (LSCN), and administration and warehousing. Construction includes redundant mechanical and electrical systems with backup power, secure organizational vehicle parking, loading/service areas, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Utility Monitoring Control Systems (UMCS) connection. Adherence to TEMPEST security standards will be provided. Low Impact Development Integrated Management Practices (LID-IMPs) and sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping, and signage. Heating and air conditioning will be provided by connection to a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are not required. Facilities will be designed to a minimum life of 40 years in accordance with DoD Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Access for individuals with disabilities will be provided. Cooling is estimated at 128 tons for the administrative and support areas, 232 tons for the Data Center, and 245 tons for redundant mechanical systems. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W9126G22R0056' to obtain more details.* Magnitude of Construction is between $25,000,000 and $100,000,000. Questions and/or comments relative to these documents should be submitted via e-mail to: Contract Specialist - Vernon Valigura U.S. Army Corps of Engineers, Fort Worth District ATTN: Vernon Valigura Phone: (817) 886-1634 Email: vernon.n.valigura2@usace.army.mi *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 28,300 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |