Similar Projects
Last Updated | 07/13/2023 10:27 AM |
Project Title | Replace Hazardous Laboratory Exhaust Fans, Coolbaugh Hall - Colorado School of Mines |
Physical Address | View project details and contacts |
City, State (County) | Golden, CO 80401 (Jefferson County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of July 13, 2023, an architect has been selected and this project is in the design stage. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Colorado School of Mines is seeking design services for the Replacement of Hazardous Laboratory Exhaust Fans in Coolbaugh Hall (CO). Coolbaugh Hall has large laboratory exhaust loads served by fans that are beyond their useful life. This project will design the replacement of the fans and greatly increase the reliability of the lab exhaust system, and the safety for students, faculty, and staff. New exhaust fans include Perchloric Acid fans with integral acid washdown systems, new stacks, motors, controls, and variable frequency drives. Existing exhaust fans will be abated and disposed of appropriately. Scope of Services includes Site Survey, Schematic Design, and Design Development; Construction Documents; Opinion of Probable Cost; Bidding Assistance; Construction Administration; OAC Meetings; Pay Apps, COB/COP; Submittal Review; Construction Observation; Record Drawings and Closeout. Buyers Requirements General Requirements - Bidder Prequalification/Preregistration Required Job Location Golden, Colorado Questions are submitted online No The method of Contractor Selection has not been Determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |