Similar Projects
Platteville High School Improvements
Renovation - 13,500 SF
Conception
Platteville, WI 53818

Maple Road Proposed Subdivision
New Construction
Design
Jackson, WI 53037

Saint Ambrose Academy
New Construction, Addition - 44,582 SF
Design
Fitchburg, WI 53711

High School - Middle School Cafeteria Commons Remodel and Addition
Renovation, Addition - 4,800 SF
Bidding
$2,000,000 est. value
Hillsboro, WI 54634

FEMA Safe Room & Link
Addition
Post-Bid
Spencer, WI 54479

Oostburg School
Renovation, Addition
Post-Bid
$7,500,000 est. value
Oostburg, WI 53070

Elk Mound High School Phase 1 Additions and Phase 2 Remodel
Renovation, Addition
Results
Elk Mound, WI 54739

Casimir Pulaski High School - Div 1-Autobody Shop
Renovation
Results
Milwaukee, WI 53215

High School Additions and Renovation Bid Package 2
Renovation, Addition
Construction
Clinton, WI

Wisconsin School Of The Deaf - Elevator Addition
Renovation
Construction
Delavan, WI 53115

Bay View High School - Exit Sign Upgrades
Renovation
Post-Bid
Milwaukee, WI 53207

Harold S Vincent High School - DIV 2-Barn Infrastructure Upgrades
Renovation
Results
Milwaukee, WI 53224

Lourdes Academy
Renovation, Addition - 27,211 SF
Construction
Oshkosh, WI 54902

AASD Einstein Middle School FCS Lab
Renovation
Post-Bid
Appleton, WI 54911

Slinger High School Interior Toilet Alterations
Renovation - 1,700 SF
Results
Slinger, WI 53086

Reported 05/27/2022 12:00 AM
Project Title

Chippewa Falls High School Toilet Room Renovation

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Details

459 SF - Middle/Senior High School, 459 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents