Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Blackhawk Junction - Phase 1 Improvements
Infrastructure
Bidding
Prairie du Chien, WI

Blackhawk Junction - Phase 1 Improvements
Infrastructure
Bidding
Prairie du Chien, WI

Itasca East 2nd Interceptor Hydrogen Sulfide Sanitary Sewer
Post-Bid
Superior, WI 54880

Steam Line Replacement Marquette to South Housing - MEP
Post-Bid
Less than $500,000 est. value
Prairie du Chien, WI

2020 Marquette Avenue Road
Results
Less than $1,200,000 est. value
Franklin, WI 53132

2020 Marquette Avenue Road
Results
Less than $1,200,000 est. value
Franklin, WI 53132

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Rehabilitation of Sanitary Sewer Main and Manholes in Various Areas, and Sewer Lateral Work in Riverdale Park Lift Station "F" Area and Riverland Drive Lift Station "H" Area
Infrastructure
Bidding
Mequon, WI

2021 Lead Service Line
Post-Bid
Fond du Lac, WI

Sanitary Sewer Repair
Results
Less than $105,000 est. value
Greenbush, WI

Sanitary Sewer Improvements
Renovation, Infrastructure
Bidding
Rock Springs, WI

Pump Station Removal and Sanitary Sewer
Demolition
Post-Bid
River Falls, WI

CSO 102 Rehabilitation - Humboldt
Results
Milwaukee, WI

Longfellow Parking Lot And Playground
Renovation
Post-Bid
Eau Claire, WI 54703

Last Updated 09/21/2021 03:27 PM
Project Title

Northeast Acres Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Dodgeville, WI   (Iowa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Northeast Acres Phase 1 Improvements- to include: the construction of Lisa St (525 LF), Road B (1525 LF), Road C (640 LF) including grading, storm sewer, sanitary sewer, water main, base course, curb and gutter, asphalt pavement, landscaping, restoration of the work area, and other miscellaneous items in conformance with the contract documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents