Similar Projects
Asphalt Paving At 8 LNA Sites
Term Contract
Bidding

Atlantic City Expressway Heavy Highway Job Order Contract
Term Contract
Bidding

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

Road Improvements Project - George`s Place
Post-Bid
Clinton, NJ

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Route 78, Rockfall Mitigation
Results
$20,000,001 to $50,000,000 est. value
NJ

Runway 4-22 Rehabilitation Project
Term Contract
Construction
$1,800,000 est. value
Whitehouse Station, NJ 08889

Roadway Improvement Project for Sun Ridge Drive
Post-Bid
Flemington, NJ 08822

Roadway Reclamation (FDR) of Manchester Road
Results
Flemington, NJ 08822

Providing All Excavation and Repair Services
Term Contract, Infrastructure
Post-Bid
High Bridge, NJ

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Washington Avenue Improvement Project Section III and River Road Improvement Project Section I
Results
$332,758 est. value
High Bridge, NJ 08829

Road Resurfacing Project for Baptist Church Road Section 2A Base
Infrastructure
Post-Bid
Hampton, NJ

Maintenance Roadway Contract C213
Results
$10,000,001 to $20,000,000 est. value

Reported 04/21/2022 12:00 AM
Project Title

2021 Grant Avenue and Allen Street Improvements Project

Physical Address View project details and contacts
City, State (County) Lambertville, NJ   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The total project consists of Bid B. Bid B consists of improvements to Grant Avenue, from State Route 179 southward to Belvidere Avenue, as well as improvements to Allen Street, from Belvidere Avenue to Coryell Road. This includes roadway repairs, milling, resurfacing, repointing of select concrete curb, resetting utility structures, maintenance and protection of traffic, and site restoration. Complementary work to furnish and install accessory materials as may be necessary may be if and where directed items by the Owner. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Existing Condition Information, Traffic Information.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 06 - Wood, Plastics, and Composites, Maintenance of Wood, Plastics, and Composites, Maintenance of Composite Assemblies, Composite Restoration.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents