Similar Projects
LPGA Lake - 6 Weir Replacement
Infrastructure
Bidding
$91,500 to $118,000 est. value
Daytona Beach, FL

Blue Springs (Bank Stabilization)
Post-Bid
$550,000 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage Repair
Results
Less than $400,000 est. value

Sweetwater Hills Drainage Improvements
Results
Less than $200,000 est. value
Port Orange, FL 32129

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Deltona High School - Bus Loop and Drainage Renovations
Results
Less than $123,789 est. value
Deltona, FL 32725

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Riverfront Park Seawall Replacement
Results
Less than $3,326,655 est. value
Daytona Beach, FL 32100

Flomich Street and Riverside Drive Storm Outfall Replacement
Results
Less than $150,000 est. value
Holly Hill, FL 32117

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Drainage Repair
Results
Less than $1,300,000 est. value
FL

Drainage Repair
Results
Less than $300,000 est. value
FL

49 Lantana Drive Drainage Improvements
Results
DeBary, FL

Last Updated 06/30/2021 08:58 AM
Project Title

Sunrise Park North - Northern Bulkhead Replacement

Physical Address View project details and contacts
City, State (County) Holly Hill, FL 32117   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $561,232
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Marine contractor(s) to replace an approximately 330 foot section of concrete bulkhead with a vinyl sheetpile bulkhead with integral concrete cap and concrete batter piles. The installation of the new bulkhead will be constructed immediately waterward of the existing bulkhead. Removal of the existing bulkhead cap will be required to facilitate the construction of the new cap.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents