Similar Projects
Santa Rita Water Reclamation Facility (SRWRF) Treatment Complex Basement Leak Mitigation
Infrastructure
Bidding
Durango, CO 81301

Evidence Incinerator System
Renovation
Bidding
Colorado Springs, CO 80906

2.46 MGD WWTF Nutrient Improvements Finishes
Post-Bid
Snowmass Village, CO 81615

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

CMGC Chemical Phosphorus & UV Disinfection Project
Results
Englewood, CO 80110

Headworks and Odor Control Project
Results
Less than $6,000,000 est. value
Superior, CO 80027

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Job-Order Contract Services (JOCs) for General Construction Projects.
New Construction
Bidding
Englewood, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

2020 Trenchless Sewer Main Replacement
Results
Less than $1,164,404 est. value
Arvada, CO 80002

Avon WWTF Lab Improvements
New Construction
Bidding
Vail, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

Non-Potable Water Reuse System
Results
Pueblo, CO 81007

Lazy Glen Wastewater Treatment Facility
Renovation
Bidding
CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

Last Updated 10/04/2021 11:14 AM
Project Title

WRRF Primary Clarifier Rehabilitation

Physical Address View project details and contacts
City, State (County) Boulder, CO 80301   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractor to complete a rehab project of the primary clarifiers at the site of the City of Boulder Water Resource Recovery Facility (WRRF) located at 4049 N. 75th Street, Boulder, CO 80301. The overall project will consist of repair of three (3) primary clarifiers. Primary Clarifiers 1 &2 have a radius of 40’-0” and a sidewall height of 12’-2” with a scum baffle located 6’-8” from the inner face of the sidewall and supported from the effluent launder. Primary Clarifier 3 has a radius of 70’-0” and a sidewall height of 13’-2” with an scum baffle located 7’-4” from the inner face of the sidewall and supported from the effluent launder.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents