Similar Projects
Roof Repairs
Term Contract
Post-Bid
Rochester, NY 14609

Roof Repair Services
Term Contract
Post-Bid
Greece, NY 14515

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

R-18 Scattered Site Roof Replacement
Post-Bid
Rochester, NY 14611

R-17 Roof Replacement Nine Residential Houses
Results
Rochester, NY 14611

Roofing MACC
Post-Bid

R-16 Roof Replacement Six Residential Houses
Results
Rochester, NY 14611

Roofing Repair and Maintenance
Post-Bid

Clinton Avenue Firehouse Roof Restoration
Results
Less than $82,000 est. value
Rochester, NY 14614

Roof Repair Services
Term Contract
Post-Bid
Rochester, NY

Roof Replacement at 58-66 Merrimac Street
Results
Rochester, NY 14611

Roof and Gutter Repair
Term Contract
Post-Bid
NY

Highland Upper Gatehouse Roof Replacement and Various Repairs
Results
$129,000 est. value
Rochester, NY 14620

Roofing Preventative Maintenance, Repair and Replacement Services
Term Contract
Results
Brockport, Churchville, Fairport, Hilton, Honeoye Falls, Pittsford, Rochester, Rush, NY 14543

Last Updated 09/21/2021 08:51 AM
Project Title

433 Wilder Road Roof Replacement

Physical Address View project details and contacts
City, State (County) Hilton, NY 14468   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the entire Roof System over Residence. Includes, but is not necessarily limited to the following: 1.Remove the existing asphalt shingle roofing system complete down to the existing wood decking. Any damaged decking will be quoted and result in a change order. 2.Provide and install a new 30-year asphalt shingle roofing system complete, including all flashings, underlayment’s, ice barriers, venting, accessories, and other roofing materials as required for a complete system. 3.Remove and replace exhaust vent covers as per existing, typical. 4.Remove and replace drip edge at all eaves and gables, typical. 5.Flash all penetrations, typical. 6.Remove and replace ridge vents on all ridges, typical. 7.No asbestos-containing materials may be used.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents