Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Johnson-Morristown STP 2919 (1) and Morristown STP 2920 (1) and Johnson STP 030-2 (35)
Results
$10,000,000 to $25,000,000 est. value
Johnson, Morristown, VT

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Clif Reynolds Road Culvert Replacement
Infrastructure
Post-Bid
$300,000 to $400,000 est. value
Cambridge, VT 05464

FY 22 Paving
Results
Stowe, VT

Andrews Road Culvert Replacement
Infrastructure
Post-Bid
$200,000 to $300,000 est. value
Cambridge, VT 05464

2021 Paving Projects
Results
Hyde Park, VT

Old Ice House Road Improvements
Infrastructure
Post-Bid
Elmore, VT 05680

Statewide - Southern Region Stp Crak(42)
Results
$1,000,000 to $2,500,000 est. value

Statewide - Northern Region STP CRAK(41)
Results
$1,000,000 to $2,500,000 est. value

Hartland Bt 0153
Infrastructure
Results

Miscellaneous and Parking Lot Paving
Infrastructure
Results
Johnson, VT

Brookfield-Montpelier Im Surf(67)
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Reported 07/18/2022 03:45 PM
Project Title

VCR Connector Trail - Salem Church/Harrison Roads - Spotsylvania County

Physical Address View project details and contacts
City, State (County) Morristown, VT 05661   (Lamoille County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $380,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Morristown, Vermont. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Construct a ten foot shared use path from Salem Church Rd (Rte. 639)/Harrison Road (Rte. 620) intersection to existing VCR Trailhead in Harrison Road Park. To provide a shared use path connection from the VCR Trail in Harrison Road Park to the Salem Church Rd (Rte. 639)/Harrison Road (Rte. 620) intersection in order to connect with planned shared use path to be constructed along Harrison Road (Northside), Salem Church Road (Eastside), and Leavells Road (Westside). This project is in included in the Spotsylvania County FY 2023-2027 Capital Improvement Plan (CIP). As of July 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents