Project Title | Tuscola County - Central Dispatch Generator Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Caro, MI 48723 (Tuscola County) |
Category(s) | Government/Public, Single Trades |
Sub-Category(s) | Electric, Fire/Police Station |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $40,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of July 22 2022, the project was awarded to Lee Machinery Movers but the amount , start/end date was not confirmed. You may contact the following person if you have any questions or require clarification on any topics covered in this Request for Proposal: Director Jon Ramirez Office: 989-673-8738 Ext. 2 Cell: 989-550-4036 Email: jramirez@tuscolacounty.org Tuscola County reserves the right at its sole discretion to reject any and all proposals received without penalty and not to enter a contract as a result of this RFP. The County also reserves the right to negotiate separately with any source whatsoever in any manner necessary to attend to the best interests of the County, to waive irregularities in any proposal and to accept a proposal which best meets the needs of the County, irrespective of the bid price.Please respond to jramirez@tuscolacounty.org with any questions or concerns. The following generator replacement project is being requested in this proposal, any deviation must be explained fully before it will be accepted. This proposal is for the purchase of the following equipment, installation of all equipment at Tuscola County Central Dispatch, which is located at 1303 Cleaver Rd, Caro, MI 48723 Generator: New 75kW standby generator Natural gas / liquid cooled Transfer Switch: New 400 Amp automatic transfer switch 208 Volt - 3 phase Mounting Equipment & Installation: This proposal is for the complete replacement of the existing standby generator system from start to finish including all needed permits. New generator would be placed in location of existing generator next to the west exterior wall (see photos) Transfer switch to be mounted inside the building in existing area of electrical panels and transfer switch (see photos) Wiring of new transfer switch to also include integration of existing Uninterrupted Power Supply system. In addition, we are asking to add the capability of an additional external electric connection that would allow the use of an mobile generator to easily be attached to the building should the primary standby generator fail |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |