Similar Projects
Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Aurora, IL 60502

St James Farm Near Warrenville - DuPage County
Infrastructure
Conception
$300,000 CJ est. value
Warrenville, IL 60555

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

Village of Westmont 2022 Gateway Signs
Infrastructure
Bidding
$300,000 CJ est. value
Westmont, IL 60559

Steeple Run Elementary School Additions and Renovations Project - Bid Group No. 2 Bid Packages 6-12
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Naperville, IL 60540

Pavement Marking Installation
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Downers Grove, IL 60515

Excavation and Underground Utility Repair
Term Contract, Infrastructure
Post-Bid
Naperville, IL

Building Demolition and Site Restoration
Demolition
Post-Bid
West Chicago, IL 60185

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Fullerton Park Culvert Lining
Results
Wheaton, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Polo Club Residential Subdivision
New Construction, Infrastructure
Pending Verification
$187,000,000 CJ est. value
Naperville, IL 60540

Last Updated 10/06/2022 04:08 PM
Project Title

Klein Creek Stream Restoration Project (Reaches 5, 6, and 7)

Physical Address View project details and contacts
City, State (County) Glendale Heights, IL 60137   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $993,031 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Qualification: Yes The work in general shall consist of site clearing, excavating the creek channel, concrete channel crushing, installation of bank stabilization, site dewatering, by-pass pumping, storm sewer improvements, installation and maintenance of soil erosion and sediment control, seeding, landscaping, landscape restoration, natural area maintenance and monitoring, including burning, cutting, herbiciding, seeding and interseeding, and annual report preparation, as further described in these contract documents for the work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). The Village of Glendale Heights will in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. The bidder shall not take advantage of any errors or omission in the plans or proposal. Minority and Women Owned Businesses (MBE/WBE) are encouraged to submit bids on this project. Each bid shall be accompanied by a proposal guaranty in the form of a bid bond, executed by a corporate surety company, a bank cashier's check or a certified check payable to the Village of Glendale Heights for not less than five percent (5%) of the amount bid. The proposal guaranty checks of all, except the two lowest responsible bidders, will be returned after the proposals have been checked and tabulated. The proposal guaranty checks of the two lowest responsible bidders will be returned after the contract and the contract bond of the successful bidder have been properly executed and approved. Bid bonds will not be returned. The Village of Glendale Heights reserves the right to waive technicalities and to reject any and all proposals for any reason deemed in the best interest of the Village of Glendale Heights. Unless all bids are rejected, the contract award will be made to the lowest responsive responsible bidder. In determining who the lowest responsive responsible bidder is, the Village of Glendale Heights will consider all factors which it, in its discretion, deems relevant in determining who the lowest responsive responsible bidder is. Bidders who are awarded a contract shall be required to provide a Labor and Material Payment Bond and a Performance Bond, each in the total amount of the contract sum upon execution of the contract. The general prevailing rate of wages in DuPage County for each craft or type of worker or mechanic needed to execute the contract or perform the work, also the general prevailing rate for legal holiday and overtime work, as ascertained by the Illinois Department of Labor, shall be paid for each craft or type of worker needed to execute the contract or to perform the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents