Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Expo/Crenshaw Transfer Station Improvements - Los Angeles County Metropolitan Transportation Authority
Infrastructure, Renovation
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Merced Avenue Greenway Project
Infrastructure
Bidding
$10,000,000 CJ est. value
South El Monte, CA 91733

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

Suzanne Middle School New Two Story 10 Classroom Science and Technology Building and New Gymnasium
New Construction - 16,672 SF
Results
$17,000,000 est. value
Walnut, CA 91789

Lynwood Urban Bike Trail
New Construction
Results
$3,630,000 est. value
Lynwood, CA

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

C Line (Green) Extension To Torrance - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Torrance, CA 90503

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

Last Updated 04/27/2023 08:08 PM
Project Title

Lakewood High School Portables & Fields Project & Aquatic Center Inc. 1

Physical Address View project details and contacts
City, State (County) Lakewood, CA 90713   (Los Angeles County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Balfour Beatty Construction, LLC is requesting bids for the awarded Lease-Lease Back project. LBUSD Prequal Required Skilled and Trained Workforce Requirements Community Workforce Development Agreement 3% DVBE Goal Performance and Payment Bonds required for contracts awarded over $100,000 No Bid Bond OCIP NO Exclusions RFIs must be submitted electronically Bid Submissions via CM bid program ONLY Scope of Work: This project consists of the on-site relocation of existing portable classroom buildings and the installation of new ADA concrete ramps, demolition of existing portables, restroom ADA upgrades, Varsity, and Practice softball field, resurfacing of existing tennis courts, repave, slurry, and restripe all play courts and demolition of the existing playfield in preparation for the future aquatic center. Bid Packages: 02.40 Existing Conditions, Earthwork 03.30 Structural Concrete, Masonry, Concrete Paving 09.00 Finishes 09.90 Painting 10.00 Miscellaneous Specialties 11.68 Playfield Equipment 22.05 Plumbing & Site Utilities 26.00 Electrical, Communications, Electronic Safety & Security 32.00 Asphalt Paving 32.30 Fences & Gates 32.80 Landscape & Irrigation DISTRICT PREQUALIFICATION: Per PCC 20111.6, all MEP subcontractors are required to be prequalified with Long Beach USD and must submit a prequalification questionnaire at www.QualityBidders.com ten (10) business days prior to the bid opening, if not already prequalified. The Current list of LBUSD Prequalified contractors can be obtained by visiting: https://www.lbschoolbonds.net/work-with-lbusd Question Deadline 04/11/2023 at 4:00 PM PT RFI DEADLINE: ALL REQUESTS FOR CLARIFICATION must Requests received after the deadline will not receive a response. Failure of a bidder to request clarification of apparent

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents