Similar Projects
Eastern Band of Cherokee Indians Masterplan
Renovation, Addition
Conception
Cherokee, NC 28719

Emilia's Acrobatics, Gymnastics and Cheerleading
Renovation - 20,000 SF
Design
Hendersonville, NC

YMCA and Housing
New Construction - 93,336 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28209

Multipurpose Indoor Sports Complex Project Funding
Post-Bid
NC

Renovation of the Ayden Arts and Recreation Gymnasium
Renovation
Post-Bid
Ayden, NC 28513

Fetzer Gym Renovations
Results
Chapel Hill, NC 27514

Catawba River Soccer Complex Phase III
Results
Morganton, NC 28655

Qubein Arena
New Construction
Construction
$100,000,000 est. value
High Point, NC

Westchester Country Day School
New Construction, Renovation - 50,481 SF
Construction
High Point, NC 27265

Calvert Sports Academy and Development Center
New Construction - 272,044 SF
Pending Verification
$10,000,000 CJ est. value
Holly Springs, NC

Turf Field and Parking
New Construction
Design
Huntersville, NC 28078

Premier Martial Arts
Build-Out - 1,891 SF
Post-Bid
Chapel Hill, NC 27514

W R Anderson Gym Renovation
Results
$225,000 est. value
Winston-Salem, NC 27107

Southern Wayne HS Competition Gymnasium
Construction
Dudley, NC

Field House
New Construction
Design
Huntersville, NC 28078

Last Updated 05/20/2021 04:32 PM
Project Title

West Brunswick High School Baseball Hitting Facility

Physical Address View project details and contacts
City, State (County) Shallotte, NC 28470   (Brunswick County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope involves sitework including surveying, erosion control, storm water modification, grading as shown on Civil Plans from Paramounte Engineering dated November 2020; construction of hitting facility including footings, slab, masonry, engineered sealed design & erection of metal building, electrical, and finishes as shown on plans SBHS Hitting Facility Plans provided by Goodrich Architecture dated 08/3/2020; terms from WBHS Hitting Facility General Conditions and all incidental work relating to project in order to provide complete and operating system. Extending concrete walk at Front Gate and installing 5’ concrete sidewalk per Civil Plans provided by Paramounte Engineering. Demo existing Hitting Building and attached structures, existing concrete pad and footings and existing batting cages. Removal and disposing of debris in proper fashion.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents